Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Bloomdale, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Bloomdale, OH?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Bloomdale

Avatar for First Light Paving
First Light Paving
5.0(
5
)
Asphalt Paving - InstallAsphalt SealingAsphalt Paving - Repair or Patch

Serving Bloomdale, OH and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

We pride our company on reliability, great communication, integrity, and quality work. We are experts in our trade and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!

Finished product
Before
5 neighbors recently requested a quote
Avatar for Concrete Auto LLC
Concrete Auto LLC
5.0(
1
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Bloomdale, OH and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

"Winter was comeing in fast and they were here evryday.They worked hard trying to finish before snow.They worked long hours and did a wonderful job finishing the driveway to the specs we requested..They were extremely professional .We were so happy with their work.We hired them to come back in spring and lay a sidewalk and a slab in our back yard.They did what others said couldn't be done due to dropping temperatures. We recommend them for all your concrete work."
Concrete Auto LLC
Concrete Auto LLC
Concrete Auto LLC
Concrete Auto LLC
Concrete Auto LLC

+9

Response time3 days
Response rate94%
Recommended by100%of homeowners
McVicker International
4.0(
4
)
Concrete Driveways - Install

Serving Bloomdale, OH and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"I hired Mcvicker International too help repair a few cosmetic and structural damages in my dry wall before giving it a fresh coat of paint. In my foyer, main Hallway, Living Room and Dining Room with some touch ups above my tile surround in my kitchen. Ive attempted to attach photos but the site seems to reject them? However it was superb quality regardless."
23 neighbors recently requested a quote
...
Showing 1-10 of 88
Asphalt Driveways questions, answered by experts

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

Yes, using recycled asphalt millings is an eco-friendly alternative compared to concrete. Millings are reclaimed pieces of gravel that are recycled into aggregate that can be used on driveways, patios, walkways, basketball courts, tennis courts, and more.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The choice between asphalt and concrete depends on your priorities, budget, and climate.

Concrete is generally more durable, lasting up to 50 years with minimal upkeep, and offers more customization options like staining and stamping, which can add more to a home's value. However, it is more expensive upfront and can be prone to cracking in cold climates where water can freeze and expand.

Asphalt is typically cheaper and quicker to install and is easier to repair. It performs better in colder climates. However, it requires more maintenance, including regular resealing, has a shorter lifespan, and can get hot and sticky in intense sunlight.

Ultimately, if durability and long-term value are key, concrete is often the better choice. If upfront cost and performance in cold weather are more important, asphalt may be preferable.

The Bloomdale, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.