Top-rated generator install pros.

Get matched with top generator install pros in Valley Stream, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Valley Stream, NY?

Select your specific project to find the pro for you.

TRUSTED BY VALLEY STREAM, NY HOMEOWNERS

  • Average homeowner rating star icon5
    Average homeowner rating
  • Verified reviews icon11
    Verified generator installs reviews

Find Generator install pros in Valley Stream

Avatar for A/C Performance Power, Inc.
A/C Performance Power, Inc.
5.0(
4
)

Serving Valley Stream, NY and surrounding areas

Approved

In business since 2017

Free estimates

Emergency services offered

"Jim, the Owner provided timely, Expert generator repair, to get a 15 year old 30KW generator that hadnâ  t run in years operational in 30 minutes. We were fortunate to find him, and appreciate his skill, integrity...truly a consummate Professional ! 5+ Star recommendation"
Generator repair
Generator repair
Generator repair
Generator repair
Generator repair

+27

Response time9 hrs
Recommended by100%of homeowners
Avatar for Real Power Electrical Contractors
Real Power Electrical Contractors
5.0(
6
)

Serving Valley Stream, NY and surrounding areas

Approved

In business since 2014

Credit card accepted

Offers commercial services

"Real Power Electrical came to my property and provided a thorough explanation of the work needed along with an itemized receipt of the products being installed. The process from estimate to work completion was quick and efficient."
Response time1 day
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Mr. Wonderful's Electric, Inc.
Mr. Wonderful's Electric, Inc.
4.7(
14
)

Serving Valley Stream, NY and surrounding areas

Approved

In business since 2000

Free estimates

Credit card accepted

"Quick response; courteous and professional. Would definitely recommend this company for any electrical. I would definitely call Mr. wonderful Electrical for future electrical needs."
200 amp 2 meter service
200 amp PVC service
Chandelier
LED hi hats
200 amp panel

+5

Response time4 hrs
Response rate94%
Recommended by92%of homeowners
GenShield LLC
New to Angi

Serving Valley Stream, NY and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We specialize in interior painting and provide unmatched customer service! You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!\n

2 neighbors recently requested a quote
...
Showing 1-10 of 180
Generator Install questions, answered by experts

You can expect a diesel generator to last for up to 30,000 hours of use, which works out to 20 to 25 years with the proper maintenance, of course. That depends on how much you use it, so a diesel generator used for emergencies a couple of times a year will last a lot longer than a generator that takes over for a faulty electrical grid every month for a day or two. 

The amount of time a standby generator can run continuously is around 3,000 hours on average. However, standby generators can generally run indefinitely as long as they have a continuous fuel supply. Generators hooked up to a home’s natural gas supply are the best option for extended usage, as these won’t rely on a finite fuel supply based on how much you have in storage. Generators running on liquid propane or diesel won’t last as long, as these require fuel storage and regular refueling to stay running.

A 1,500 square foot home will likely need a 15kW to 20kW generator. When deciding on whole-house generator size, add up the total wattage of the devices that you’d like to continue running during a power outage. That way, you can ensure you purchase a generator that can power your necessary appliances or medical equipment during an electrical emergency.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

In some situations, yes. Never try to put biofuel into any home generator without checking the specifics first. If a generator has the ability to run on diesel, it can also run pure biofuel (the clear kind made from seed oils, for example). But if you are using biofuel made from animal fats or vegetable oils, the generator will need significant modifications before it can handle a sludgier type of biofuel.

The Valley Stream, NY homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.