Top-rated siding pros.

Get matched with top siding pros in Rocky Point, NY

Enter your zip and get matched with up to 5 pros

TRUSTED BY ROCKY POINT, NY HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon287
    Verified siding services reviews

Find Siding pros in Rocky Point

JOHN CECERE SIDING
4.9(
107
)
Vinyl Siding - Install or Completely ReplaceMetal Siding: Install or Completely ReplaceWood or Fiber-Cement Siding - Install or Completely Replace

Serving Rocky Point, NY and surrounding areas

Approved

Super Service Award Winner

In business since 1985

Free estimates

Warranties offered

"John Cecere Siding provided outstanding services. We had our entire house sided. And from beginning to end, John was on site, working alongside his crew, Kevin, Pat and Brian. They were wonderful guys, making sure the job was not only well done, but that we were happy along the way. Timely arrival each day, clean and spotless property and thoughtful concerns about the needs of the house construction. I have nothing but great praise and I highly recommend John Cecere Siding!"
Response time1 day
5 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Long Island Windows and Siding
Long Island Windows and Siding
4.5(
51
)
Vinyl Siding - Install or Completely Replace

Serving Rocky Point, NY and surrounding areas

Approved

In business since 1966

Free estimates

Emergency services offered

"Extremely happy with the work done by these professionals. One of the lowest bids, theyâ ve been in business for a long time, they take pride in their work, high quality materials used and attention to detail. All they do is siding and windows, so they get the job done right and get job done quicker than a general contractor would as they specialize in this area of construction. Steve was onsite everyday, quickly responds to calls and texts and the men working for him are hard-working, respectful gentlemen. The siding came out absolutely beautiful. They even did a little extra with no added costs. They did a fantastic job cleaning up when they finished, they used magnets daily to keep nails off the driveway and out of my tires. You canâ t go wrong with All Island Windows and Siding. Highly recommended! Iâ ll recommend them to anyone I know in need of siding, doors and/or windows."
Stonybrook
Stonybrook
Stonybrook
Stonybrook
Stonybrook

+5

Response time8 hrs
Response rate94%
30 neighbors recently requested a quote
Avatar for Undaunted Restoration, Inc.
Undaunted Restoration, Inc.
4.9(
127
)
Asbestos Siding - Repair

Serving Rocky Point, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Emergency services offered

"Courteous and professional service. They responded quickly. Understood my problem and concerns and completed the work immediately. Asbestos removal is not inexpensive but I was satisfied with the cost and the speed of service. I was glad to support a local small business"
Response time1 day
Response rate90%
68 neighbors recently requested a quote
Avatar for Premium Roofing & Siding, Inc.
Premium Roofing & Siding, Inc.
4.4(
191
)
Vinyl Siding - Repair or Partially ReplaceWood or Fiber-Cement Siding - Repair or Partially Replace

Serving Rocky Point, NY and surrounding areas

Approved

In business since 2014

Free estimates

Emergency services offered

"Premium Roofing and Siding came out to give me an estimate on some siding that had blown off. Phil was very prompt and returned my call. That's rare these days. He gave me a fair price and fixed my problem on the spot. He also checked the all the siding and repaired what needed it. It's unusual these days to find a responsible and fair company that doesn't try to rip you off! I highly recommend Premium Roofing and Siding."
chimney LEAD flashing
chimney flashing
repair
repair
repair

+106

Response time9 hrs
1 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for Non Stop Home Improvements Inc
Non Stop Home Improvements Inc
5.0(
57
)
Vinyl Siding - Install or Completely ReplaceMetal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially Replace+4 more

Serving Rocky Point, NY and surrounding areas

Approved

In business since 2004

Free estimates

Emergency services offered

"I can’t say enough how great Non Stop Home Improvements Inc is. Dennis and his men were clean, respectful and on time everyday. My roof, siding and door are a beautiful addition to my house. Dennis answered every question I had, and every text that I sent him. I would highly recommend this company for any contracting needs."
New Roof - Setauket
New Roof - Setauket
New Roof - Setauket
New Roof - Setauket
New Roof - Setauket

+12

Response time1 day
Response rate100%
3 neighbors recently requested a quote
Avatar for Double A Roofing and Siding
Double A Roofing and Siding
5.0(
9
)
Vinyl Siding - Install or Completely ReplaceMetal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially Replace+4 more

Serving Rocky Point, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Emergency services offered

For over 20 years, Double A Roofing & Siding has been offering high-quality roofing, chimney, and siding services for all our customers in Long Island.\n\nWe are Long Island’s trusted roofing specialists. Our team offers 24/7 emergency services, and free estimates for all our customers, see for yourself why Double A Roofing & Chimney is Long Island’s leading roofing service team.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

7 neighbors recently requested a quote
Recommended by33%of homeowners
Avatar for Selective Remodeling
Selective Remodeling
4.6(
98
)
Vinyl Siding - Install or Completely ReplaceMetal Siding: Install or Completely ReplaceMetal Siding: Repair or Partially Replace+4 more

Serving Rocky Point, NY and surrounding areas

Approved

In business since 1996

Free estimates

Warranties offered

"With me, it’s not just about the job, it’s about how these guys made me feel. I feel important to them, respected and a priority. I feel as if they are interested in my daily opinion. They want to please me as a customer. They respect my feelings, my suggestions and opinions. From start to where we are now, I am ahead of schedule on the kitchen. They are here when they say they will be here. They understand I am living out of the garage and dining room. They respect that I have a child who has needs while they are here. They stay past 5pm until the work is done. They check up on my progress daily. Mike and Dominick come to see the work often. I can trust their workers with my house/property when I am not home. I can go to work and not worry about what’s happening with my house. I also don’t have to pay all at once. They broke up the entire amount into percentages so I pay as we go through the weeks. They schedule all the work/specialists so I don’t have lag time or issues getting steps completed. They make sure my job is up to code. And most importantly, they clean up before they leave, inside and outside. I can’t tell you how important that is with a child and a cat. I don’t have to worry about him getting into the tools or garbage. I also trust that they will do what it takes to keep me satisfied as a customer. They listen to my concerns/comments as you can see each day whether at my home or over text (my preferred method of communication). They came up with a timeline that was loose so we could tweak plans when necessary and so I could plan my life around the renovations. I am pleased at the progress made so far and look forward to using my new kitchen! See what's gone on below! WORK SCHEDULE SO FAR July 17, 2016, Monday 6:45am Dumpster arrives July 18, 2016, Tuesday 8am the crew of 5 men arrived. The put plastic up around the back room and doors so the sawdust would be contained. They had the entire kitchen demolished by 3pm. The dumpster was filled. They vacuumed and left. What was planned for 2 days took 1. July 19, 2016, Wednesday Electricians and Plumbers came 8am. They found some areas not up to code and fixed the problems. Left at 4pm. I believe Mike arranged to have the specialists come at close times. It seemed when one left, someone else pulled up 30 seconds later. Talk about SERVICE! HVAC came at 4:45pm to look at what items would be needed and promised to see me the next morning. I was amazed so much got accomplished in such a short time. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. I gave him another check after he reviewed some of the financials with me. He makes it easy to not have to have all funds upfront. I feel more comfortable with this way. He plans it in percentages. Sometimes there are additional expenses such as more electrical work than was planned/billed for so that was an addition but these things are expected. I am trying to go with the flow. Changes happen. July 20, 2016, Thursday HVAC Mike came at 7am so that the wall guys would not have him in the way. We decided together to move two vents from the floors to the walls. He updated the heating vents and spent 3 hours making it to code. Walls went up as HVAC Mike worked. Ceilings were put up and 2 coats of Spackling. James, Jorge and Freddy did a terrific job. Neat, fast and looked great. I was very pleased with the work. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. Framing and Sheet rocking was planned for 4 days. It took 2. We were ahead of schedule. July 21, 2016, Friday James did a third coating of Spackle. He painted a first coat of my Soft Fern green color and the ceiling white. Dominick came by to check on the work/progress and see how we were doing. James vacuumed and cleaned up before he left. My husband found some areas he wanted addressed and I texted his concerns to Dominick. Dominick shared it with Mike. I didn’t want to bother Mike since it was the weekend, but Dominick felt our concerns were important. They were addressed Saturday morning. July 22, 2016, Saturday 8:30am. Eddie and Javier arrived to work on the floors. They nailed down the wire mesh which was a job that took all day. Tile needed to be cut as well. They left the place clean and neat. July 23, 2016, Sunday DAY OF REST July 24, 2016, Monday 8:45am. Eddie and Javier needed to mud the floors to make them level which they were not. One side needed to be higher than the other. Eddie and Javier worked very hard and left at 7pm after they cleaned up. It was a very long day for them. Mike made arrangements with the appliance store to deliver on August 1. July 25, 2016, Tuesday 8:45am. Eddie measured and laid the time on the leveled floors. It was a terribly hot day and Javier had to lug cement and cut tile in the heat. I felt so bad for him. He never complained and worked so very hard. The floors looked great but Eddie felt like it was not looking right so he lifted three rows of tile and did them again to get it right. He felt he wanted perfection and I appreciated that. I complimented him and shared that with Mike when he came to see the progress. They left at 5:30pm and planned to come back for the Backsplash when it was time. 4 days were planned to do the job. It took 3. July 26, 2016, Wednesday Freddy and Jorge came to work on making saddles and putting up molding around the doors and window. Freddy was so funny. He kept cleaning and I told him to not worry about the dust on the doors, that I would take care of it later. He was so concerned about keeping the place clean for me. I told him it was impossible since there was so much cutting of wood. Jorge spoke to me about the saddles and I made suggestions. He asked my opinion and he made it to my specifications such as overlapping the saddle to the stair for safety. They cleaned up and I was pleased to find out we had several days off to have family time instead of having construction. July 27, 2016 Thursday Jorge and Freddy came to complete the saddles and woodwork. Once again, outstanding! I left them alone all day while I went to work. I had no worries. I also knew Mike stopped by often at the site to check on progress but I trusted them completely. July 28-31, 2016 REST August 1, 2016, Monday Cabinet specialists Anthony and Paul arrived. They worked from 8:45-5pm. They put cabinets up, cut and measured over and over. They said, "Measure three times, cut once." They were very nice, knowledgeable, spoke kindly to my son and had a smile and a kind word to me most often during the day. August 2, 2016, Tuesday Cabinet guys arrived at 8:45am. I went to work and when I came back most of the cabinets were up. Since the floor was 3 inches higher than anticipated, they called Scott at Selective Sculptures to order a smaller cabinet so they would not have to cut it. The cabinet would arrive Thursday. August 3, 2016, Wednesday I called Mike to tell him I am taking a day of rest. August 4, 2016, Thursday Cabinets are done! Paul and Anthony arrived at 8:30 and they were completed by 5pm. They vacuumed and touched up the cabinets. They put the shelves in for me and discussed how to care for my cabinets. They put up the crown molding and asked my opinion about where I wanted the handles to go on the cabinets. Mike came by to see how it was progressing, to get a check from me and to plan the coming week of work. He's planning on my refrigerator and stove going in and working on Monday. As you can guess I'm tired of washing dishes in my bathroom and am grateful it's going to happen so quickly!"
Towers Renovations
Beier Bathroom
Deleon Kitchen
Deleon Master Bathroom
Deleon Master Bathroom

+279

Response time3 days
Response rate100%
3 neighbors recently requested a quote
...
Showing 1-10 of 452
Siding questions, answered by experts

You should consider acclimating the wood for your shou sugi ban siding for around two weeks before installation to balance its moisture content and prevent warping. That additional step will ensure your materials are prepped for installation, avoiding complex repairs down the line. Consult your siding contractor for additional installation instructions for this specialized material.

For the materials alone, a square of siding costs an average of $600, but prices can range from $100 to $3,000, depending on the material. Vinyl siding costs toward the lower end of that range, while real brick or stone siding costs closer to the higher end. Keep in mind that many boxes of siding contain two squares, enough to cover 200 square feet, so you may need to double your cost if you only need one square.

Professional installers typically recommend caulking between siding boards, but it depends on the material. With Hardie board and fiber cement siding, manufacturers don't recommend adding caulk because it can trap moisture in the joints or discourage flexibility in fluctuating temperatures. Consult your local siding contractor about caulking best practices before adding any to your home’s exterior.

Fiber cement shingle siding is made from a blend of common ingredients, including cement, sand, water, and wood or cellulose fibers. The composition of the mixture varies depending on the manufacturer, however, with some makers opting to include special additives to improve longevity and resilience, and some include dyes and pigments to create custom colors that don’t require painting.

The cost to install board and batten siding averages between $2.50 and $12.50 per square foot, including labor and materials. Major cost factors of this project include the square footage, the siding material, and the local labor rates. Additional costs include the number of windows and doors, the height of the home, and the painting or staining you want done to the siding.

The Rocky Point, NY homeowners’ guide to siding services

From average costs to expert advice, get all the answers you need to get your job done.