Top-rated subcontractors.

Get matched with top subcontractors in Randolph, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Randolph, NY?

Select your specific project to find the pro for you.

TRUSTED BY RANDOLPH, NY HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon56
    Verified subcontracting services reviews

Find Subcontractors in Randolph

Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Randolph, NY and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Exteriors By Maria
Exteriors By Maria
3.6(
28
)

Serving Randolph, NY and surrounding areas

In business since 1999

Free estimates

Emergency services offered

"Maria was great, I had to make this review, even though I am not a computer person, but she deserves he recognition. Maria showed up here, very short women, but a power house, she gave me a price and the work began within 3 days. I couldn't believe my eyes, she is a total power house, she climbed up a 40 foot ladder like she was fearless, and when I seen her grab it, I offered my help, and all he crew members said, oh don't worry she is stronger than all of us, I laughed,
Anyway, my house was so perfectly painted and changed so much, invited guest were passing my house, because they did no recognize it. Her crew was very respectful of her, and hey all shared laughs, and accomplished allot. They were always professional, and the work, and work ethic, was flawless. he crew always dressed in Company shirts, and what I liked the most, their construction did not affect me a all, their ladders and supplies were always out of the way and did no block sidewalks, and at the end of the day, all stuff was cleaned up, and her equipment, locked behind my garage, not in it. Maria became friends with me and my wife, and we told her we would be upset if she did not stop and visit in the future, we loved her passion for her work, and personality is respectful, sweet, but fierce
"
JOHN DAVID SALON
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+14

Recommended by82%of homeowners
Avatar for Express Construction Services
Express Construction Services
5.0(
2
)

Serving Randolph, NY and surrounding areas

In business since 2004

Free estimates

Credit card accepted

"I really loved working with Express Construction!. They were very professional with getting my new shower installed, and the follow through on things were amazing. Our installer Josh did a fantastic job! Also the Price was 15% cheaper than everyone else I got quotes from!!! Best Service Ever!! I am a customer for LIFE! Thanks Again -AJ"
Bathroom Remodel project showcase
AFTER
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Showing 1-10 of 32
Subcontractors questions, answered by experts

Universal design costs can be minimal when you add them during construction; however, adding universal design principles to existing homes can sometimes increase renovation costs. For example, a mid-grade bathroom remodel is estimated to cost around $30,000, while a standard universal design remodel can cost closer to $40,000. Adding accessible design components can include widening hallways ($500 to $2,000), curbless showers ($2,000 to $8,000), and widening doors ($400 to $800). Keep in mind that these increased costs can lead to higher resale values because universal homes may appeal to a wider variety of buyers.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Make sure you’re getting the right size to meet your space needs, including enough space both side to side and vertically to accommodate your RV’s features and allow you to safely move it in and out of the garage. 

If you’re building an attached and enclosed garage for your RV, you’ll also want to give some thought to whether you’d like to add workspace, water or electricity, or additional storage. If so, you’ll need a garage with larger dimensions.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

The Randolph, NY homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.