Top-rated barndominium builders.

Get matched with top barndominium builders in Pulaski, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your barndominium building project in Pulaski, NY?

Select your specific project to find the pro for you.

Find Barndominium builders in Pulaski

Avatar for Van Dusen Exteriors
Van Dusen Exteriors
4.8(
193
)
Shed, Barn or Playhouse - Repair

Serving Pulaski, NY and surrounding areas

In business since 2002

Free estimates

Credit card accepted

"From our first contact with this company, we were very impressed by their attitude, professionalism, doing what they said they would do. Price charged within local standards and used quality products. They kept in contact with us, keeping us up to date on plans for job. The job had to be postponed for 2 weeks due to constant rain but they let us know in plenty of time to make sure it was ok with us. The office contact, Megan, is very friendly and efficient. The crew that came was super excellent. They went right to work, no wasted time. Kept work area neat, cleaned up after first day. On second day, finished the job and left our home and yard looking better than it did before they came. Our next door neighbor commented that he had never seen such a professional job and group of people. We have mobility issues so they carried the extra shingles to our basement and put them exactly where we wanted them and even picked up some heavy bags of salt for our water conditioner from the local Home Depot and put them in our basement. Cannot say enough good things about them. Our roof looks great, they provided a great warranty and quality product. We have already scheduled them to come back for an estimate to replace our outside steps (which they hauled away at our request at no extra charge) Would highly recommend them. They even gave us a gift of homemade baked goods as a thank you for using their services Bob and Carol Merritt"
Siding Windows and Doors
Complete exterior remodel
custom specialized work
Additional Photos
Additional Photos

+3

Recommended by96%of homeowners
Avatar for Nystrom Contracting LLC
Nystrom Contracting LLC
4.9(
9
)
Shed, Barn or Playhouse - Repair

Serving Pulaski, NY and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"Everything went very smoothly. Very knowledgeable, efficient and personable. Answered all the questions I had and did a very thorough job. We will absolutely be using again for another home project we have."
Electrical Project
Remodel
Kitchen and Bath Remodeling Project
Electrical Project
Remodel

+44

Recommended by100%of homeowners
Avatar for Fourever Cure Services
Fourever Cure Services
4.7(
15
)
Shed, Barn or Playhouse - Repair

Serving Pulaski, NY and surrounding areas

"Excellent work, very nice workers, excellent oversight and attention to detail. Plenty of workers to get the job done fast. Cleaned up all the mess after too. Very trustworthy and accommodating."
Handyman Services Project
Painting
Before photo
Landscaping
Landscaping & gutter cleaning

+116

Recommended by100%of homeowners
...
Showing 1-10 of 98
Barndominium Builders questions, answered by experts

Your foundation contractor will first need to remove the topsoil and any vegetation within 4 feet of the area around the barn. They’ll need to ensure they have clear access to the site to begin excavation, after which they can begin construction.

Rather than using a common two-by-four piece of wood for a rafter, you probably will use two-by-six, two-by-eight, two-by-ten, or even two-by-twelve boards. Wider lumber is typically a better choice in a larger building as it provides more sturdiness. Some installers may use wider lumber for rafters near the edges of the roof, where the greatest stress occurs, and save money with narrower lumber toward the middle.

The construction stage is almost always the longest part of building a house. Within this stage, framing often takes the most time, lasting anywhere from one week to a couple of months, depending on the home's size, the crew, and the time of year. Other parts of the construction phase include pouring the foundation and installing doors, windows, a roof, siding, drywall, and flooring. The planning and design phase can also be very time-consuming, sometimes taking months or even years, especially for a custom home. The final finishing process, which includes painting and installing trim, is typically shorter than the construction or planning stages.

The maximum size of a tiny home you can move depends on your state transportation guidelines, but the rule of thumb is a maximum of 400 square feet. However, as long as it falls within the local limits for traveling on public roadways, you should be good to hit the road.

While it’s best to have access to large, healthy, strong trees in a safe position, treehouse living is still possible without them. Contractors can fit tree posts to build the structure onto or use posts as additional support alongside the trees themselves. If you’re in doubt about the suitability of the trees on your land, consult with a local treehouse builder before you start the project.

The Pulaski, NY homeowners’ guide to barndominium building

From average costs to expert advice, get all the answers you need to get your job done.