Top-rated basement remodelers.

Get matched with top basement remodelers in Nunda, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Nunda, NY?

Select your specific project to find the pro for you.

Find Basement remodelers in Nunda

Avatar for D&M Contracting
D&M Contracting
5.0(
6
)
Basement - Remodel

Serving Nunda, NY and surrounding areas

Approved

In business since 2020

Free estimates

Small jobs welcome

"I cannot say enough good things about these men! We are very pleased with the bathroom remodel they just did. They went above and beyond to ensure everything was perfect paying attention to details most would not. I will continue to use them for all our future repairs and remodels, and you should also!!!"
project photos
project photos
Project Photos
Project Photos
Project Photos

+44

3 neighbors recently requested a quote
Avatar for J&T Sherry Construction
J&T Sherry Construction
4.9(
6
)
Basement - Remodel

Serving Nunda, NY and surrounding areas

Approved

In business since 2019

Offers commercial services

Customers say: Quality work

"Tony came into our job to fix and finish a remodel of full kitchen, bath, mud room, dining room and siding that another contractor bitched up. I wish I had found him first as it would have save me a lot of stress and money. Tony and his crew were all very professional and came up with some really nice design ideas that really helped bring the entire project together. He is responsive when you reach out to him with questions which is very reassuring when you are going through any remodel. If you want someone that will get the job done right and they way you want it work with T&J Sheery"
Bedroom
Livingroom
Bathroom
Living room
Diniing room

+11

Response time2 days
Response rate93%
9 neighbors recently requested a quote
Avatar for R&D Design Studio
R&D Design Studio
5.0(
1
)
Basement - Remodel

Serving Nunda, NY and surrounding areas

Approved

Small jobs welcome

"So happy we chose R&D for our exterior wall repairs! they were great to work with throughout the process of what turned out to be a complicated issue. Their communication was really appreciated as they dug into things and problem solved some unique issues with how the previous home owners had cut corners on the house. R&D wasn’t the cheapest initial bid we received but I have no doubt that we would have wound up paying more in the end for a lower quality result with anyone else. Thanks guys!"
1800's Home Addiction
1800's Home Addiction
1800's Home Addiction
1800's Home Addiction
1800's Home Addiction

+6

A & W General Contractors
5.0(
1
)
Basement - Remodel

Serving Nunda, NY and surrounding areas

Approved

A & W General Contractors is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers interests, and make their concerns the basis of our business.

Backyard patio cover
Backyard patio cover
Backyard patio cover
Backyard patio cover
Backyard patio cover

+2

4 neighbors recently requested a quote
...
Showing 1-10 of 60
Basement Remodel questions, answered by experts

While framing a basement is not as difficult as finishing a basement, it's something you should typically leave to the pros. That’s because if something is installed correctly, it will affect your entire basement. However, you can take care of some of the smaller tasks, like filling holes or putting up some insulation.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Lifting a house and adding a basement is one way to add usable square footage. Lifting or jacking a house is a complex process, and it can be expensive, not to mention that you won’t be able to live in your house while it’s lifted, due to safety concerns. Lifting a house should only be done by experienced professionals.

Yes, you can add a door to your basement—it might even be required, depending on building codes in your area and whether or not you’re using the basement as a bedroom. A basement contractor can give you some advice on installation and help you add a door to your basement.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

The Nunda, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.