Top-rated basement remodelers.

Get matched with top basement remodelers in Fillmore, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Fillmore, NY?

Select your specific project to find the pro for you.

Find Basement remodelers in Fillmore

Avatar for Robinson's Premier Interiors
Robinson's Premier Interiors
4.1(
21
)
Basement - Remodel

Serving Fillmore, NY and surrounding areas

Approved

In business since 2009

Free estimates

Emergency services offered

"Don, Joe, and Matt are the guys you need for any home interior improvement work. These guys installed new vinyl plank flooring for us and did a fantastic job. They kept me informed on the details of the work and answered any questions I had. Our basement walls aren't exactly square in some places (be careful who you hire - it wasn't these guys) but they installed the floor with care and in a way that didn't make the uneven walls obvious. We liked the work so much, we had them back a week later to do the baseboards and door trim we were planning to do ourselves. In fact, we have another project in mind for the summer and I know we will be talking to these guys when it's time. Thanks Don, Joen and Matt for a job well done!"
Response time2 days
Response rate96%
5 neighbors recently requested a quote
Avatar for High Tech Construction Co
High Tech Construction Co
4.3(
43
)
Basement - Remodel

Serving Fillmore, NY and surrounding areas

In business since 1987

Free estimates

Emergency services offered

"Very well!  The work was done quickly, professionally, and great clean up after the job was completed, we are very pleased with the results and would recommend High Tech and definitely use them again
"
Facade Restoration - High Tech Construction Co
stoop restoration -high tech construction co
Wood Stoop
Limestone Stoop
brownstone stoop and facade restoration

+20

Recommended by81%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Fillmore, NY and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for O'Hare Construction
O'Hare Construction
5.0(
11
)
Basement - Remodel

Serving Fillmore, NY and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"We were very pleased with AJ's work ethic. He was punctual, knowledgeable, pleasant, and very neat. His prices were also very reasonable. We were very pleased with our 12' x 30' composite deck. We would highly recommend him, and we already have."
Decks
Deck
deck
Deck
Deck

+203

Response time4 hrs
Response rate92%
Recommended by100%of homeowners
Avatar for Total Basement Finishing of WNY
Total Basement Finishing of WNY
5.0(
1
)
Basement - Remodel

Serving Fillmore, NY and surrounding areas

In business since 2018

Free estimates

Warranties offered

AtTotal Basement Finishing Of WNY we take pride in reliability, great communication, integrity, and quality work. We the industry leader in basement remodeling and will do our best to keep you as educated as we can on your particular task or project. We look forward to earning your business!\n

Finished Egress
Brighten Office
Installation
Extra Living space
Playroom

+3

Response time2 days
Response rate86%
Showing 1-10 of 44
Basement Remodel questions, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The average cost of remodeling a basement is $30 to $75 per square foot. If your space is unfinished and looks like it may need more help, use the higher number when calculating your estimated basement remodeling costs. A good rule of thumb is to add an additional 20% to the top of your estimate to cover any “what if” situations.

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

Anything having to do with the structure of your home, such as raising the ceiling, is usually the most expensive part of finishing a basement. Another project component that could be a surprisingly high expense is adding an exterior entrance. 

The cost of a walkout basement can be anywhere from $5,000 to $35,000.

The Fillmore, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.