Top-rated excavation pros.

Get matched with top excavation pros in Neversink, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Neversink, NY?

Select your specific project to find the pro for you.

Find Excavation pros in Neversink

Avatar for Lilco Construction Inc
Lilco Construction Inc
5.0(
5
)
Excavation - Major Grading or ReslopingBuilding Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business+1 more

Serving Neversink, NY and surrounding areas

Approved

In business since 2001

Free estimates

Warranties offered

"Had the opportunity to experience Lilco's work on several projects. These guys always had a professional attitude and took the time for all preparations and quality control. They did not leave a mess or unwarranted damages like so many fly-by-night contractors tend to do. They even magnet swept driveways for screws/nails whenever they finished loading out for the night. The owner is always up front about any costs, with no hidden charges to get the jobs done."
7 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for GMZ Contracting LLC
GMZ Contracting LLC
4.9(
9
)
Landscape - Minor Grading or Resloping

Serving Neversink, NY and surrounding areas

Approved

In business since 2019

Free estimates

Small jobs welcome

"Overall I was very happy with Frank and his team from GMZ Contracting. They showed up when they were supposed to, were friendly and respectful and did beautiful work. They installed knotty pine in my bedroom and did the flooring for the upstairs bedroom."
1 neighbors recently requested a quote
Avatar for Arbor Edge
Arbor Edge
5.0(
1
)
Building Site - Preparation and Clearing

Serving Neversink, NY and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \n\nCall us today you'll be pleased you did. Thank you!\n

14 neighbors recently requested a quote
Avatar for CLC Landscape & Construction
CLC Landscape & Construction
5.0(
1
)
Excavation - Major Grading or Resloping

Serving Neversink, NY and surrounding areas

Approved

In business since 2022

Free estimates

Offers commercial services

"Excellent communication! Provided an estimate within a day of contact. Once the estimate was approved CLC immediately scheduled the work. CLC arrived as scheduled, and performed outstanding work for a reasonable price. I recommend CLC Landscaping!!"
4 neighbors recently requested a quote
...
Showing 1-10 of 81
Excavating questions, answered by experts

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

Yes, professional installations include trenching or borehole drilling required for ground loops.

Yes, trenchers can go through gravel. Gravel is made up of smaller, softer rocks that certain trenchers are able to cut through. Just be sure to use a rock wheel trencher or chain trencher, both of which are made to cut through rocky landscapes and gravel pathways without dulling the teeth or chain.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

Septic drain lines (or leach lines) are typically buried between 18 and 36 inches underground, and should be at least 6 inches below the surface. These pipes are perforated and surrounded by filtering materials like sand or gravel. Burying the lines at this depth helps minimize odors and allows bacteria and other biological processes in the soil to effectively treat the wastewater. Burying lines too close to the surface can cause issues unless the soil is very compact and stable.

The Neversink, NY homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.