Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Macedon, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Macedon, NY?

Select your specific project to find the pro for you.

TRUSTED BY MACEDON, NY HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon285
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Macedon

Avatar for AI Developers Masonry
AI Developers Masonry
4.9(
116
)

Serving Macedon, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2018

Free estimates

Emergency services offered

"I had a super positive experience with them. On time, responsible, super respectful of my (very picky) neighbor. Great price and quality work. And cleaned up very well to boot. Definitely two thumbs up. Thank you guys."
My jobs
My jobs
My jobs
My jobs
My jobs

+36

Response time6 hrs
Response rate95%
104 neighbors recently requested a quote
Avatar for Rochester Patio and Landscape
Rochester Patio and Landscape
3.9(
18
)

Serving Macedon, NY and surrounding areas

Approved

In business since 2012

Free estimates

Small jobs welcome

"I am pleased with their workmanship and professionalism. They arrived on time and finished the job in about 3 hours. Note: My foundation was actually a standard concrete brushed foundation -- 22 ft x 14 ft. It will serve as a foundation for a future steel shed. Great job! Let's just say that I was impressed!"
Stamped concrete
Stamped Concrete
stone veneer
Stone venner
restoration

+98

Response time3 days
6 neighbors recently requested a quote
Recommended by81%of homeowners
Avatar for AAA Masonry
AAA Masonry
3.7(
178
)

Serving Macedon, NY and surrounding areas

Approved

In business since 1997

Free estimates

Emergency services offered

"Cleaned and inspected chimney and fireplace. Very pleased with the work. The supervisor, Mark, arrived after work was completed to discuss. Honest, didn't try to ramp up costs. Would hire again."
AAA Masonry Gallery
AAA Masonry Gallery
AAA Masonry Gallery
AAA Masonry Gallery
AAA Masonry Gallery

+5

Response time2 days
1 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for Hess Land Development
Hess Land Development
New to Angi

Serving Macedon, NY and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

I’m a locally owned family run and operated business. I take pride in helping out customers and always strive to please ! I’ve been in business for over 15 years and have a vast background in excavation, drainage and ground work.

4 neighbors recently requested a quote
Avatar for MLM Trucking
MLM Trucking
New to Angi

Serving Macedon, NY and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

MLM Trucking is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business

Response time5 days
Avatar for JM Masonry
JM Masonry
New to Angi

Serving Macedon, NY and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

With over a decade of experience JM Masonry specializes in delivering top-quality concrete services for residential and commercial projects alike. From durable driveways and sturdy foundations to decorative concrete features, our skilled craftsmen bring precision and expertise to every job. With a commitment to excellence and customer satisfaction, we ensure that every concrete project is completed on time, within budget, and to the highest standards of quality.\n\nEnglish and Spanish Available \n\nDeposits May Be Required - Inquire Within \n\nAccepts Cash, Checks and CashApp

1 neighbors recently requested a quote
...
Showing 1-10 of 100
Asphalt Driveways questions, answered by experts

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Macedon, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.