Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Lovelock, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Lovelock, NV?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Lovelock

AZZARELLOS TRUCK N HOE
0.0(
2
)
Concrete Finishing, Overlays & Coloring - ApplyConcrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Lovelock, NV and surrounding areas

Approved

In business since 1979

Free estimates

Credit card accepted

We are committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

6 neighbors recently requested a quote
Recommended by100%of homeowners
Epoxy Flooring questions, answered by experts

Installation typically takes 2-5 days, including preparation, pouring, and curing time.

The best time to seal your concrete driveway is sometime in the spring and fall when the temperature is above 55 degrees Fahrenheit. Keep an eye on the weather, and be sure to pick a day without rain on the forecast for at least 24 hours. Lastly, be sure you can leave the space free of foot and car traffic for the full drying time.

The cost to replace a driveway coating ranges from $275 to $850, or $550 on average. Naturally, larger driveways cost more than smaller driveways. The type of driveway sealant and the number of coats also impact the cost. Coal tar sealant costs the least, while latex acrylic sealant costs the most. Oil-based sealants fall in the middle. 

You can’t paint a foundation like you would the walls in your home; there are a few extra important steps to take. Instead of just busting out the paint, you should clean the surface and fix any impurities before grabbing the brush. Using a paint sprayer to apply sealant and primer will ensure you have the perfect canvas to apply your chosen paint color.

Most concrete sealers take about one to three hours to dry. However, those that penetrate may take up to 48 hours or more to completely dry. You can find specific drying details from the manufacturer on the label.

The Lovelock, NV homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.