Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Lockwood, NV

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Lockwood, NV?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Lockwood

Avatar for J & M Construction
J & M Construction
4.9(
26
)
Interlocking Pavers for Driveways & Floors - Install

Serving Lockwood, NV and surrounding areas

Approved

In business since 2015

Free estimates

Warranties offered

"24' wide by 26' long driveway installed. Lots of rebar installed. Job was completed in 2 days. Bid was lower than the other estimates I received. They were very professional and cleaned up after they were all done."
Stamp concrete
Pavers patio
stamp patio
Hot tub pad
Pavers

+35

Response time2 days
3 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Heavy Duty Concrete and Pavers
Heavy Duty Concrete and Pavers
4.4(
141
)
Concrete Driveways - InstallInterlocking Pavers for Driveways & Floors - InstallConcrete Driveways & Floors - Install- For Business

Serving Lockwood, NV and surrounding areas

Approved

Super Service Award Winner

In business since 2017

Free estimates

Warranties offered

"Heavy Duty Concrete & Pavers replaced our deteriorating 30-year-old walkway and driveway with pavers â 2800 sf in total, in March 2024. They also replaced the driveway apron and gutter that were also in bad shape. Sean visited our home and provided a detailed quote with different options (part concrete and part pavers, all pavers, all concrete) within two days of our contacting them. Denise in the office was very helpful when we asked for some minor changes and produced a final quote that day (the cost was competitive with other quotes received). Our job was scheduled for ten days later. Isaac came to our home the first day and explained the process. Work commenced with four to eight workers every day and seven workdays later the project was complete except where concrete had to be poured for the apron and gutter (this had to be inspected by the County). Two days after the concrete was poured a crew came and finished the pavers around the apron. The entire job was completed in eight workdays spread over two weeks. I should mention that they also installed a drainpipe under the driveway with an emitter at the bottom of the driveway to solve a long-standing drainage problem at the front of our home. Communication with everyone was excellent and the work was scheduled and completed in a timely manner. Our new walkway and driveway are beautiful - the workmanship is outstanding. We recommend Heavy Duty Concrete & Pavers and will use them again if we decide to upgrade our backyard."
Zypher Cove
Walkway
Walkway
Backyard Project
Backyard Patio

+2

Response time2 days
108 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Affordable Pavers, LLC
Affordable Pavers, LLC
5.0(
24
)
Interlocking Pavers for Driveways & Floors - InstallBrick and Stone Driveways & Floors - Install

Serving Lockwood, NV and surrounding areas

Approved

In business since 2008

Free estimates

Warranties offered

"Wonderful experience from start to finish! Jose & his crew are very professional and do amazing work. Our new driveway is stunning! The crew worked very hard on it and it shows. Competitive rates and friendly service—highly recommend!"
Courtyard
Retaining Wall
Drivewauy
Driveway
Driveway

+129

Response time1 day
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for M & M Excavating and Landscape Services, LLC
M & M Excavating and Landscape Services, LLC
4.8(
23
)
Interlocking Pavers for Driveways & Floors - Install

Serving Lockwood, NV and surrounding areas

Approved

In business since 2016

Offers commercial services

Customers say: Quick response

"Matt was helpful, prompt, adaptable and professional and did a great job for my commercial project. He was willing to do whatever it took for my project to be successful and be completed within my short-scheduled timeframe. This is how a business should be run. I would highly recommend his services and I will definitely use him again on future projects."
Front & Backyard upgrade
Front & Backyard upgrade
Front & Backyard upgrade
Front & Backyard upgrade
Front & Backyard upgrade

+63

Response time5 hrs
Recommended by100%of homeowners
...
Showing 1-10 of 84
Asphalt Driveways questions, answered by experts

Overall, a paver driveway is considered the easiest to maintain because homeowners are able to do driveway repair one piece at a time without impacting the rest of the driveway. Unlike paved options, paver driveways contain individual stones that aren't physically connected. By comparison, you may need to reseal or redo a full asphalt driveway if just one portion sustains a significant crack.

Asphalt, which is stone mixed with tar, is the most common material for outdoor basketball courts because it’s so sturdy and versatile. However, you don't have to use it: another option is polymeric rubber, which has shock pads that can prevent injury. This option is a little more expensive, ranging between $16 and $25 per square foot.

Materials used for indoor basketball courts, such as hardwoods, aren’t really an option outdoors.

A solid driveway starts with the right asphalt mix, and for most homes, dense-graded hot mix asphalt (HMA) is the most recommended. It’s both durable and flexible, making it a reliable choice for residential use. A properly compacted 2-3 inch layer on a well-prepared crushed stone base will hold up for years. In areas with harsh winters or scorching summers, a slightly modified mix can help prevent cracking and rutting. No matter the climate, quality installation is just as important as the material itself, so hiring an experienced contractor ensures a smooth, long-lasting driveway built to last.

Professionals ensure a solid base and smooth finish, enhancing durability and appearance.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The Lockwood, NV homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.