Top-rated basement remodelers.

Get matched with top basement remodelers in Wilber, NE

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Wilber, NE?

Select your specific project to find the pro for you.

Find Basement remodelers in Wilber

Avatar for RMG REMODELING CONSTRUCTION LLC
RMG REMODELING CONSTRUCTION LLC
New to Angi

Serving Wilber, NE and surrounding areas

Approved

Free estimates

Warranties offered

Small jobs welcome

I have spent the last four years remodeling and constructing new buildings, working for other companies such as Hausmann Construction and Samsung Construction—including on the renovation of the football stadium in Lincoln, Nebraska. I have carried out renovations of churches and schools, as well as basements, garages, bathrooms, and kitchens. Now, I have established my own company, and I am ready to apply all my expertise to grow my business.

Avatar for ALUND Contracting
ALUND Contracting
4.9(
5
)

Serving Wilber, NE and surrounding areas

In business since 2012

Free estimates

Small jobs welcome

"Andrew was awesome! He installed a new light fixture and patched a section of drywall in my basement. Everything looks amazing! It Is like the damage was never done! His pricing was very reasonable and he even purchased the new light for me. Would definitely recommend!!"
Living Room
Prep work
TV Surround
Painting
Shelves

+451

Response time8 hrs
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Wilber, NE and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for JNDP Construction
JNDP Construction
5.0(
1
)

Serving Wilber, NE and surrounding areas

In business since 2021

Free estimates

Emergency services offered

Residential installation and remodeling, we install doors, windows, cabinets, closets, base board, door trim. As a locally owned and operated business we feel invested in our clients and constantly strive for customer satisfaction. Call or message us to schedule an estimate today!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by100%of homeowners
Showing 1-10 of 19
Basement Remodel questions, answered by experts

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

Egress windows or doors are required in finished basements to meet safety and building codes. If your basement is unfinished and used as a storage space, egress windows are not required, but anything considered a habitable space must have an additional point of egress in addition to the stairs.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Save money on your basement finishing project by making cost-effective decisions such as minimizing structural changes and avoiding costly construction revisions. DIY simpler tasks such as painting or basic cleanup to reduce labor costs. You can also opt for energy-efficient fixtures and materials that may qualify for rebates or tax incentives.

The Wilber, NE homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.