"Super great carpenter! Did a great job with whatever I asked and he stands behind his bids and his job. He came back and checked things over a year later and made sure everything was still up to par."
"Amanda was really very good! At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it. It was very clear that she knew her business and she gave me several ideas that I had not even thought about. I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!
I'm Pat Bartos; we are your premier choice for addition and remodel work as well as most home improvement projects. I have provided high quality work and friendly customer service for years. Call me today!
Roy Varilek is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.
Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.
Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.
Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.
The average cost to remodel a basement is between $12,100 and $33,400. Depending on the project's complexity, the price can be as low as $3,500 or exceed $50,200. For a simple project like adding a home office, you might spend between $500 and $3,000. However, a more extensive project, such as adding a bathroom, can range from $6,600 to $16,500. The final cost is influenced by factors like the basement's size and condition, the type of remodel, material choices, your location, and accessibility. For an accurate price, it's best to consult with a basement remodeling team.
While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.
The Stuart, NE homeowners’ guide to basement remodels
From average costs to expert advice, get all the answers you need to get your job done.
An unfinished basement has a lot of potential for a family room or guest suite. So how much does it cost to finish a basement? Read on for all cost factors.
Hiring a bad basement remodeler can wreak havoc on the look and longevity of your unfinished space. Here are red flags to look for as you vet basement contractors.