Top-rated generator install pros.

Get matched with top generator install pros in Curtis, NE

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Curtis, NE?

Select your specific project to find the pro for you.

Find Generator install pros in Curtis

Mike's Electric, Inc.
New to Angi
Generator - Install - For Business

Serving Curtis, NE and surrounding areas

In business since 1985

Free estimates

Emergency services offered

Family owned and operated since 1985 serving Cozad and the surrounding areas. We have extensive experience serving agricultural, industrial, and residential customers. 40 plus years of combined experience for installations and service calls. We have all the latest locating equipment including infrared camera, backhoe, trencher, digger derrick, power quality recorder, labeler, ground resistance tester, cable trigger, computerized conduit bender, threading equipment, PVC bender. We also have a large supply of in stock parts and electric motors.

Generator Install questions, answered by experts

Generators run on a variety of fuel types, ranging from natural gas to solar power. Keep in mind that fuel costs varying by type:

  • Natural gas: $2,000–$21,000 per year 

  • Liquid propane: $2,000–$21,000 per year

  • Diesel: $3,000–$20,000 per year

  • Gasoline: $500–$3,000 per year

  • Solar generator: $2,000–$25,000 per unit

  • Battery backup: $10,000–$25,000 per unit

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

Yes, in most municipalities, you will need a permit to install a permanent home generator, including emergency backup, partial-home, and whole-home models. Because these installations involve significant alterations to your home's electrical system and produce exhaust fumes, local governments often require a permit or inspection for safety purposes. A generator permit typically costs between $50 and $250, depending on your location. Your electrician or certified installer can usually handle the permitting process for you, but you will be responsible for the cost. It's a good practice to confirm with your installer that they will pull all necessary permits before work begins.

You can expect a diesel generator to last for up to 30,000 hours of use, which works out to 20 to 25 years with the proper maintenance, of course. That depends on how much you use it, so a diesel generator used for emergencies a couple of times a year will last a lot longer than a generator that takes over for a faulty electrical grid every month for a day or two. 

Generators are usually sized by running watts and starting watts. Ideally, you’ll want a generator that can offer both the necessary running watts and starting watts for everything you need to power without going beyond 90% of its capacity. Calculate your home’s electrical load based on the breakers in your home or adding up the appliance and lighting needs of connected rooms.

The Curtis, NE homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.