"Hope Waves did an amazing job with our above ground pool installation! Arrived earlier than scheduled, polite, professional and got the job done quick!!! The most reasonably priced company we found while researching for someone to do it! Would highly recommend this company crew to anyone!! Very pleased ☺️Duane & Kerri Behrends"
"I hired Donald to build a sundeck around my pool, that was in dire need of repair. Not only was he prompt and curtious, but he was very helpful and gave me suggestions that I hadn't thought of! Kudos to this company, and his attentive and helpful crew! Thank you Anointed Power!!!"
Install Above Ground Pools questions, answered by experts
If your pool takes longer than one or two days to fill, you might be dealing with low water pressure. Using a water pressure gauge on your outdoor tap, you can check your water pressure. A reading of 40 psi or below is considered low. A leak, a nearby water shutoff, or several other reasons could cause this.
If the water pressure isn’t a problem, you could have a low flow rate from clogs, corroded pipes, or other plumbing issues. It’s best to call in a local plumber to get to the root of the issue.
Costs range from $25,000 to $50,000, depending on size, design, and additional features.
It is generally not recommended to place a pool directly on grass. Doing so will kill the grass underneath, and the surrounding lawn may also be damaged by heavy foot traffic and splashes of chemically-treated water. For best results, create a clean, level surface by removing the grass and debris. You can then install a sturdier base using materials like sand, a concrete pad, or solid foam.
The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.
Key phases and their typical durations include:
Permits: Obtaining necessary permits can take anywhere from two to six weeks.
Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.
Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.
External factors can also cause significant delays:
Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.
Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.
No, you shouldn’t be able to taste the salt at all since saltwater pools only contain about 10% of the salt you’d find in ocean water. Saltwater pools do create some chlorine, though, so you should still try not to drink the water.
The Clarks, NE homeowners’ guide to above ground pool installation services
From average costs to expert advice, get all the answers you need to get your job done.
Ready for a backyard oasis? Learn everything about above ground pool installation, including average costs, site prep, and how to hire local pool installers.
Above ground pools are more affordable than inground pools, so can you put an above ground pool in the ground to save money? Learn when it’s safe to do so.