Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Benkelman, NE

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Benkelman, NE?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Benkelman

Avatar for Groundworks
Groundworks
4.1(
517
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Benkelman, NE and surrounding areas

Approved (Corporate)

In business since 1999

Free estimates

Warranties offered

"Price and Mariano came at specified time and injected our front concrete porch to raise it. Prince explained and showed us what they were doing. Very professional and slab is raised! Would highly recommend!"
Protect Your Basement Before & After
Correct Your Wet Basement
Protect Your Basement
Waterproof Your Basement
Protect Your Concrete Before & After

+16

Response time3 days
262 neighbors recently requested a quote
Recommended by84%of homeowners
Concrete Mudjacking questions, answered by experts

Generally speaking, push piers—or steel piers—are the best option for underpinning, as they reach down to solid bedrock to find support for your foundation rather than relying on soil, which could be subject to the same issues as the soil directly below your foundation. However, the best underpinning method for your home depends on your location, how far down the bedrock is, and the type of soil in your area. Helical piers are usually the best option for sandy soil or in areas where the bedrock is too deep to use steel piers.

Many contractors offer warranties for their work. Confirm terms before starting the project.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

The Benkelman, NE homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.