Top-rated basement remodelers.

Get matched with top basement remodelers in Oakes, ND

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Oakes, ND?

Select your specific project to find the pro for you.

Find Basement remodelers in Oakes

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Oakes, ND and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Ace Plumbing
Ace Plumbing
4.9(
8
)
Basement - Remodel

Serving Oakes, ND and surrounding areas

In business since 2008

Free estimates

Warranties offered

"Our church hired Ace Plumbing to do remodeling or our sanctuary, offices, fellowship hall, bathrooms, kitchen, and much more. His work has been top-notch. We will continue to utilize Ace Plumbing!"
Response time2 hrs
Recommended by100%of homeowners
Avatar for Lutz Home Improvement LLC
Lutz Home Improvement LLC
New to Angi
Basement - Remodel

Serving Oakes, ND and surrounding areas

In business since 2025

Free estimates

Emergency services offered

Welcome to Lutz Home Improvement LLC! We take pride in the quality of work and customer satisfaction that we give each and every customer! We are known to pay exquisite attention to detail while making customer satisfaction our top priority. Call us today to learn more about how we can help you!

Basement Remodel questions, answered by experts

You technically can paint wires in a basement ceiling, but there are several important safety and code considerations. It's safe to paint non-metallic sheathed cable as long as the labeling remains visible. You can also paint low-voltage wires and conduit and junction boxes to help them blend into your basement. 

However, you should not paint damaged or deteriorated wiring is a fire hazard because it poses a fire hazard. The same goes for painting over high-heat wires that connect to heat-generating appliances or systems. Be sure to avoid painting multiple coats onto any wires, as that traps heat and poses fire risks.

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can add a door to your basement—it might even be required, depending on building codes in your area and whether or not you’re using the basement as a bedroom. A basement contractor can give you some advice on installation and help you add a door to your basement.

The Oakes, ND homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.