Top-rated excavation pros.

Best excavation pros near Hettinger, ND

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Hettinger, ND?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Hettinger - Updated Nov 2026

All Phases Construction
New to Angi
Landscape - Minor Grading or Resloping

Serving Hettinger, ND and surrounding areas

In business since 1980

Free estimates

All Phases Construction is a full service contractor capable of handling all your residential and commercial construction projects. All Phases Construction focuses on the customer needs, and expectations to ensure your project is completed on time and satisfactorily. Customer service, quality products and craftsmanship is all you can expect from All Phases Construction. Call us today!

Edinger Landscaping, LLC
New to Angi
Landscape - Minor Grading or Resloping

Serving Hettinger, ND and surrounding areas

In business since 2020

Free estimates

We pride our company on Reliability, Great Communication, Integrity, and Quality work. We strongly believe in giving our absolute best in all of our projects, no matter how big or small. We are experts in our trade, and will always keep you educated on your particular task or project. We look forward to earning your business!

Response time2 days
Excavating FAQs, answered by experts

A walk-behind trencher can cut through roots as long as they’re not too thick, making a project much easier than digging with a shovel and other hand tools. Assess your terrain and the number of trees in the surrounding area to determine if a walk-behind trencher will ease the job. Digging a trench by hand is much more time-consuming and labor-intensive. 

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

You can bury underground electrical wire six inches deep—but only if you use a rigid metal electrical conduit. For rigid, non-metallic conduits, bury the wire at least 12 inches deep. If using an underground feeder cable rated for direct burial, you'll need to place it at least 18 inches deep, as it has no conduit for extra protection.

Concrete blocks are the cheapest way to base a shed. However, the space in between allows critters to go under, burrow, and even damage your shed’s frame. For a more pest-proof option, consider building a shed base with gravel or paver stones. Both options are fairly affordable and easy enough for a DIY project. For gravel, you can build a wooden frame to contain the loose material.

Errors in site preparation can lead to structural failures or appear costly midway. Professionals ensure detailed, reliable home base development layouts.

The Hettinger, ND homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.