Top-rated subcontractors.

Get matched with top subcontractors in Maxton, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Maxton, NC?

Select your specific project to find the pro for you.

TRUSTED BY MAXTON, NC HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon140
    Verified subcontracting services reviews

Find Subcontractors in Maxton

Mighty Hands Roofing Inc
4.2(
461
)
Major Home Repairs (General Contractor)

Serving Maxton, NC and surrounding areas

In business since 1986

Free estimates

Emergency services offered

"After the repair was done I noticed a leak in my bathroom ceiling where one of the roof vents were replaced. I called the Subcontractor Brian on a Saturday morning. The weather was cold and raining. He was at my house within the hour up on the roof and fixed the leak. I havent had any leaks since. I would hire Brain the Subcontractor again."
Recommended by80%of homeowners
Avatar for RH-Flooring and Remodeling LLC
RH-Flooring and Remodeling LLC
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Maxton, NC and surrounding areas

In business since 1997

Free estimates

Emergency services offered

"Services were performed on budget and met our timeline. We were under a lot of pressure to get into our new home. Rick did what it took to help us. He is very easy to work with. We were / are grateful to know him and will definitely hire again for any future projects."
Custom tiled shower
Master bathroom remodel
Master bathroom remodel
Master bathroom remodel
Master bathroom remodel

+66

Recommended by100%of homeowners
Avatar for Country Boyz Construction
Country Boyz Construction
4.6(
10
)
Major Home Repairs (General Contractor)

Serving Maxton, NC and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Excellent work ethic. Provided suggestions to save money and provide solutions to potential inspection concerns. Planned all necessary sub jobs and brought in experienced licensed professionals for specifics (plumbing,electrical and HVAC. Quality work performed. Stayed on schedule and estimate very close at final cost. Was flexible in adding additional ideas as the job progressed. Job site stayed clean and organized. Experienced contractor who knows his way around a vast area. The entire team was exceptional. Absolutely will hire for future projects."
Previous wood deck
Previous wood railing
Remodel Entire Home
Metal Roof
Unfinished former roofer

+155

Recommended by100%of homeowners
...
Showing 1-10 of 71
Subcontractors questions, answered by experts

Yes, you can finance cottage construction through several options. Construction loans provide funds in stages as work progresses, while home equity loans or lines of credit are available if you have existing property. Some lenders offer a combined construction and permanent mortgage. Always review loan terms and payment milestones before committing.

While concrete walls do not need to "breathe" in the traditional sense of the word, they do require waterproofing and dehumidifying methods, particularly in basements below the water table. Concrete both contains moisture from its initial installation and can absorb water when exposed. Ensuring proper basement ventilation , installing a vapor barrier, and controlling water exposure are all important tasks.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

Costs depend on project complexity, materials, labor, permits, and required revisions.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The Maxton, NC homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.