Top-rated deck staining pros.

Get matched with top deck staining pros in Lilesville, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your deck staining project in Lilesville, NC?

Select your specific project to find the pro for you.

TRUSTED BY LILESVILLE, NC HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon11
    Verified deck staining services reviews

Find Deck staining pros in Lilesville

Avatar for Mike's Painting & Pressure Washing
Mike's Painting & Pressure Washing
4.7(
28
)

Serving Lilesville, NC and surrounding areas

In business since 1996

Emergency services offered

Credit card accepted

"I would highly recommend this business.  We had them come and restain the deck and at first just powerwash the house.  They scheduled the work right away.  After doing the pressure washing, there were some areas with paint chips under the soffit.  Mike offered to repaint those for free.  During this, they noticed areas of the soffit that were rotten, so we had them repair those areas of the wood.  They also fixed a few screens that were damaged during the pressure washing for free.  
Everything turned out great, and we are very happy we had this work done.  Mike and Crystal are very professional and easy to work with.  I will be having them do some more work on our house in the near future.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+161

Recommended by91%of homeowners
Avatar for Bakers Pressure Washing
Bakers Pressure Washing
5.0(
2
)

Serving Lilesville, NC and surrounding areas

In business since 2015

Free estimates

Emergency services offered

"My yard looks awesome. Robby did everything I asked for and more. He was on time and finished in a timely manner. He made sure I was satisfied before leaving the job. He also pressure washed my house and back porch. It is lovely to be able to sit on my porch again"
Pressure Washing Project
After
Handymen Project
Concrete - Pouring & Repair Project
Concrete - Pouring & Repair Project

+8

Recommended by100%of homeowners
W&G Painting and Remodeling
5.0(
3
)

Serving Lilesville, NC and surrounding areas

In business since 1994

Free estimates

Emergency services offered

"In September of this year my wife and I bought a home near Cedar Mountain. We had
a few things that we wanted to get done to the house before we moved in. From
Florida we researched contractors as well as through friends in our new
community. I was not prepared for the casual attitude of many of the workmen I
spoke with. Out of all of them, there was only one who showed up and did the
work as promised, Mr. Wade Morris. Despite having to drive and extraordinarily
long way to our home, Wade arrived every morning at 8:30 until the job was
done. I had to return to Florida but I left Wade a key to finish up. When I got
back to NC I was pleased to find the house clean and the work done to a high
standard of professionalism. Little extras, like painting the bedroom
baseboards (which was not part of our agreement) made me appreciate Wade and
Gaye all the more.

"
.
.
.
.
.

+1

Recommended by100%of homeowners
...
Showing 1-10 of 73
Deck Staining questions, answered by experts

Avoid using cleaning products that are abrasive or contain bleach or acidic components on composite decking to avoid discoloration. Early-generation Trex decking isn’t designed to handle pressure washer cleaning—and if you use them on second-generation boards, always use a low setting to avoid the risk of damage that can risk voiding your warranty.

You’ll need to wait until the surface is completely dry, which can take anywhere from 24 to 48 hours under optimal conditions. The waiting period depends on several factors, including the type of siding and the weather conditions. Trying to paint before the surface is completely dry can trap moisture under the paint, leading to bubbling, blistering, and mold growth.

Yes, you can and should paint or stain pressure-treated wood to help prevent the boards from cracking. However, you must wait for the wood to dry out completely before applying any finish. Freshly treated wood can take weeks or even months to dry; a common recommendation is to wait three to six months. To check if the wood is ready, perform a simple water test: drip some water onto the surface. If the water beads up, the wood is still too wet and needs more time to dry. If the wood absorbs the water, it is dry enough to be painted or stained. You can proceed with building your deck or fence while the wood is still wet, but you will need to wait to apply the paint or stain.

Pressure-treated wood lasts at least 10 years, but with the right care and treatment, it can last as long as 40 years. Painting the boards is one way to increase the lifespan of pressure-treated wood. The layer of paint provides extra protection for the wood against the exterior elements and insects.

Staining pressure-treated wood is a recommended practice. While inherently resilient, it's not impervious to moisture and UV exposure. Staining treated wood is feasible and recommended for enhanced protection and longevity. Applying stain and sealant safeguards against degradation, prolonging its life span. These measures shield the wood from environmental threats while augmenting its aesthetic appeal, ensuring your investment endures the test of time.

The Lilesville, NC homeowners’ guide to deck staining services

From average costs to expert advice, get all the answers you need to get your job done.