Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Erwin, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Erwin, NC?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Erwin

AQUA HAVEN POOLS
4.8(
46
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Erwin, NC and surrounding areas

In business since 2001

Emergency services offered

Credit card accepted

"I went on Angie's List to see which pool service provider had the best ratings.  Though I traditionally have used the same contractor that installed my pool, I decided to go with the provider that had the highest ratings on Angie's List.  Happily, I was very happy with the service provided.  Last fall, Scott the owner sent out some employees to measure the precisely measure the pool.  In the early Spring, AquaHaven (AH) came back to make sure the measurements were correct.  AH sent me information via e-mail as to the different styles and types of liners that they carried.  I scheduled AH to come back in the Spring do install the liner.  AH set up a sump pump the day before installation to drain the pool.  It took approximately 10 hours to drain 18,000 gallons.  The pump was submerged and had a cut off switch so I really did not have to do anything.  Two highly skilled and professional workers showed up promptly at 8:00 a.m. the next day and finished draining the pool.  They then worked quickly to remove the old liner, prepare the metal sides and redo the flooring and walls of the pool.  Some of the pool floor and walls had deteriorated over the past 12 years so the workers quickly redid the entire damaged services leaving the pool floor and walls smooth.  The new vinyl liner was then put in place.  The workers were careful not to damage the pool floor which they had just repaired.  Once the liner was put in place, they put in vacuum blowers to remove any excess air and began filling the pool with water.  They then cleaned up completely hauling away the old liner, debris and any equipment they had brought.  After filling the pool floor with sufficient water to cover the first steps, AH came back the next day to remove the vacuum blowers.  The pool is now completely filled with water and is beautiful.
The pool liner cost approximately $1,500 and the labor, other material and tax ran around $2,700.  This was similar in cost to other contractors.  Scott, the owner, checked with me by phone the next day to see if everything was okay.  
I believe AH provided excellent service and an excellent product.  I would highly recommend them for this type of work in the future.


"
Recommended by93%of homeowners
Avatar for Tri-City Electric of NC LLC
Tri-City Electric of NC LLC
4.4(
34
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Erwin, NC and surrounding areas

In business since 1997

Emergency services offered

Credit card accepted

"I decided that I wanted a standby electric generator for my house. Not knowing anything about generators, I began looking for advice on exactly what I should purchase. After talking to several electrical contractors, Tri-City was obviously the most knowledgeable on the subject. Chad (of Tri-City) helped me choose the right generator for my situation, with no promise that I would use him to do the installation. He and his brother Jason came by here to look at my situation and didn't try to get me to commit to anything or try the old trick of "We'll knock off the charge for the estimate when we do the installation". After I had chosen a generator and had it delivered, (I got it from electricgeneratorsdirect.com), Chad and Jason came out here and built a wood-framed gravel pad, made sure it was level and attractive, then moved the generator from my garage and placed it on the pad and did all the connections that were possible before the gas company came to perform some necessary modifications. After the gas was hooked up, they returned and completed the installation. Not only did they do an outstanding job, they stayed around for a couple hours testing it to make sure it was working properly. I no longer have to think about who I will call when I need anything electrical done! These guys are head and shoulders above any other electrical contractor I was able to find!"
Additional Photos
Recommended by96%of homeowners
Heather World Pools
5.0(
2
)
Swimming Pool - Above Ground, Build or Install - Need Materials

Serving Erwin, NC and surrounding areas

In business since 2023

Free estimates

Credit card accepted

We are a locally owned and operated company. We value honesty and integrity in all aspects of our business. We offer a variety of above ground pool service that are customized to each individual project. We pride ourselves on the quality of our work, as well as our commitment to outstanding results. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

Response time2 hrs
Response rate100%
Recommended by100%of homeowners
Blue Horizon Pool & Spa, LLC
4.8(
3
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Erwin, NC and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"I highly recommend Brad We were in the process of selling our home and had to open repair and resurface our gunite pool that was 30 years old. He was able to drain the pool safely from all the debris, and repair any damage concrete, resurface and painted the pool. He also replaced the motor on the filter and re-piped all the pool lines. This was a huge job as the pool had not been opened in 4 years. He worked with our budget and was able to complete the entire job at a very reasonable cost ."
Response time7 hrs
Recommended by100%of homeowners
Avatar for Alexander Junior Construction
Alexander Junior Construction
4.4(
7
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Erwin, NC and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"Excellent company to hire for any type of project. they did a outstanding job on my fence made sure the ground was leveled out before installing and made sure that the post had extra cement in them to protect from wind damage. Company was on time and very responsible and cleaned up after themselves. Would definitely hired them again."
Floors and staircase
44x112Vinyl fencing
Remove ceiling drywall
Fencing Project
Fencing Project

+54

Recommended by100%of homeowners
Avatar for CLOSED` Eastern Mechanical & Plumbing of NC, INC
CLOSED` Eastern Mechanical & Plumbing of NC, INC
4.4(
8
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Erwin, NC and surrounding areas

In business since 2013

Emergency services offered

Credit card accepted

Eastern Mechanical & Plumbing is a "women owned" local full service plumbing & handy-man business that has been serving the Triangle & Surrounding Areas. We are experienced in diagnostics, drain cleaning and solving all plumbing problems.\n\nAt Eastern Mechanical & Plumbing we employ the most qualified plumbers in our market to ensure the delivery of world class work with superior service and professionalism. They are available 24 hours/7days a week to meet all of your handy-man, plumbing and drainage needs.\n\nWe are the new generation of trade service world with our loyalty programs, monthly specials & contests. At Eastern Mechanical & Plumbing you will receive an experience worth talking about to all your friends. Call us today and let our plumbers take a crack at it!

Additional Photos
Additional Photos
Owner
Mascot
Comic Strip Tease

+1

Recommended by85%of homeowners
Showing 1-10 of 22
Install Above Ground Pools questions, answered by experts

It depends on your priorities. Many homeowners enjoy the health benefits of a swim spa. The heated water boasts the benefits of a hot tub, which some people find helps relieve pain, increase circulation, and aid in stress relief. You’ll also be able to use it for exercise like you would a lap pool. It’s a two-in-one product.

The steps to fill a swimming pool will depend on your local building codes. However, it starts with draining the pool of all water using a submersible pump. Then your pro will lift the pool shell from the ground or break it into pieces for individual removal. The next step is filling the cavity with dirt and gravel and topping it with topsoil. Once a structural engineer deems the site safe, landscaping can start.

It is possible to install an above-ground pool yourself in about six hours, provided your yard isn't too sloped or you don't have many trees. It's imperative to ensure your ground is level; otherwise, your pool could collapse. Contact a swimming pool installer for an in-ground pool installation or to ensure your above-ground pool is installed correctly.

Yes, you can use food coloring to find a pool leak. Alternatively, you can use pool detection dyes that are nontoxic and biodegradable. Depending on how much food dye you have on hand, it may be more cost-effective to use pool dyes.

The dye test is one of the best swimming pool leak detection tools because the dyes are heavier than water. By observing where the dye gets sucked in, you can find the location of your leak.

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Erwin, NC homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.