Top-rated pool builders and installers.

Get matched with top pool builders and installers in Ledger, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your pool construction and installation project in Ledger, MT?

Select your specific project to find the pro for you.

Find Pool builders and installers in Ledger

Avatar for Choice Home Warranty
Choice Home Warranty
4.0(
5,676
)

Serving Ledger, MT and surrounding areas

In business since 2008

Emergency services offered

Credit card accepted

"It was great, the pool technician was very helpful and kept us updated on what repairs were needed. He followed up after his visit to ensure we knew the next steps. 10/10 would have this technician again."
Recommended by82%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)

Serving Ledger, MT and surrounding areas

In business since 1971

Credit card accepted

"I have been very happy with them I've had them for like seven years now. The home warranty you pay a monthly fee I think ours is like $80 a month so when you need something you call them and they send somebody out. It's a $75 service fee, but anything on top of that they pay for. The home warranty thing, every time you buy a home people try to throw in there to make it sound like it's better or something and I have bought all different kind of houses all the time and this one does not do that. Actually it has worked out pretty good, but then you have to understand the rules, read the details what they cover and what they don't cover and what the rules are. It costs $80 a month because it's got all the coverage even the pool, pool appliances, garage door opener, fans everything so that is $80 a month. It is a $75 service fee every time they come out, but just have the base one to cover the air conditioner alone is worth it. For $75 they fix whatever."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Pool Construction and Installation questions, answered by experts

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

A few different types of land surveys can help determine certain features and boundaries of your property. These include:

  • Boundary surveys describe the actual borders of a property. These are generally required when trying to get construction permits issued. 

  • Location surveys provide much of the same information as a boundary survey but also include in-depth information about any improvements made to your property. 

  • Mortgage location surveys are usually required by lenders and title companies before financing or offering an insurance policy. 

  • Site-planning surveys are done before applying for building permits and can be issued before any major home improvements. 

  • Topographic surveys provide a formal map of land elevations. It can also describe the location and size of natural features and any land improvements.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The small lines on the tape measure either indicate inches, fractions of an inch, or centimeters and millimeters. On the imperial unit side (aka the inches side), the longest lines indicate inches, followed by the next shortest lines that indicate a half-inch, and then the quarter, eighth, and sixteenth-inch. On the metric side, the lines break down meters, centimeters, and millimeters.

The Ledger, MT homeowners’ guide to pool constructions and installations

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"