Top-rated generator install pros.

Get matched with top generator install pros in Butte, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Butte, MT?

Select your specific project to find the pro for you.

Find Generator install pros in Butte

Avatar for Montana Power Solutions, LLC
Montana Power Solutions, LLC
5.0(
2
)
Fixed Generator - InstallFixed Generator - RepairGenerator - Install - For Business

Serving Butte, MT and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

"Justin did a great job installing our generator. From the time I contacted him, he had the generator ordered and installed within 10 days. He even fixed some wiring issues that our original electrical contractor left us with. We couldn't be happier with what he did and recommend Montana Power Solutions to everyone!"
15 neighbors recently requested a quote
GGC. Shane Gray
New to Angi
Fixed Generator - InstallFixed Generator - RepairPortable Generator - Install+1 more

Serving Butte, MT and surrounding areas

In business since 1992

Free estimates

Emergency services offered

I am a professional person that takes great pride in my work, in a neat and orderly Fashion. That goes above and beyond the call of work to satisfy the customers needs, from the smallest to the largest jobs.\nRanging from residential electrical repair, new and existing to home improvement and remodeling projects.

Moonlight Electric, LLC
New to Angi
Fixed Generator - InstallFixed Generator - RepairGenerator - Install - For Business+1 more

Serving Butte, MT and surrounding areas

In business since 2021

Free estimates

Credit card accepted

Moonlight Electric LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade, combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.\n

Generator Install questions, answered by experts

If your home already has a grinder pump and you’re still noticing issues (like frequently clogged toilets and sinks), it could be time to upgrade your grinder pump. Start by checking your existing horsepower. If there are four or fewer people living in your home, using a 1/2-horsepower grinder pump should be sufficient. Larger households should consider investing in a 1-horsepower grinder pump to maximize wastewater removal efforts.

Yes, installing a generator usually increases your property value because buyers are getting the added peace of mind knowing they’ll be able to maintain power through blackouts. In most cases, you should see close to a 100% return on investment (ROI). Keep in mind that home generators usually need a permanent foundation, and installing a concrete slab will likely raise your property taxes slightly.

If you’re wondering whether gas generators produce carbon monoxide, know that natural gas generators do not produce carbon monoxide if they are functioning properly, as natural gas burns cleanly. However, if the generator malfunctions and the gas does not burn completely, there is potential for carbon dioxide to be produced. To prevent malfunctions, it's crucial to perform regular maintenance, including running the generator weekly and scheduling professional inspections every 6 to 12 months. Also, be sure to test your carbon monoxide detectors regularly to ensure they function in the rare case of the generator producing carbon monoxide.

Energy output depends on turbine size, average wind speed at your site, and system efficiency. A 5 kW turbine in a good wind location can generate 8,000 to 12,000 kilowatt-hours per year, which may cover a large portion of an average home’s needs. Accurate output estimates require a professional wind assessment and a review of your household’s energy usage patterns.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

The Butte, MT homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.