Top-rated generator install pros.

Get matched with top generator install pros in Sheridan, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Sheridan, MT?

Select your specific project to find the pro for you.

Find Generator install pros in Sheridan

Zero Dark Electric
5.0(
2
)
Fixed Generator - InstallPortable Generator - Repair

Serving Sheridan, MT and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"We are so impressed with the outstanding service we received from Zero Dark Electric! From the almost instantaneous return call to the rewiring we needed done, (completed ASAP), Brandon did it right. We would definitely use Zero Dark again and will recommend them to anyone looking for an electrician."
Response time8 hrs
Recommended by100%of homeowners
GGC. Shane Gray
New to Angi
Fixed Generator - InstallFixed Generator - RepairPortable Generator - Install+1 more

Serving Sheridan, MT and surrounding areas

In business since 1992

Free estimates

Emergency services offered

I am a professional person that takes great pride in my work, in a neat and orderly Fashion. That goes above and beyond the call of work to satisfy the customers needs, from the smallest to the largest jobs.\nRanging from residential electrical repair, new and existing to home improvement and remodeling projects.

Generator Install questions, answered by experts

Costs depend on generator type, labor, and additional wiring or transfer switch requirements.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

If you have a transfer switch properly installed, the generator and main electrical power cannot feed the system at the same time. However, you should still shut off the power at your main circuit breaker panel before activating the generator. If you do that, you’ll simply need to shut off the generator and reset your circuit breaker once the local power comes back on.

No, you should never plug a generator directly into a wall outlet in your house. This practice is extremely dangerous, often illegal, and can cause "back-feeding," where power from the generator flows back into utility lines, creating a life-threatening hazard for utility workers. It can also damage your home's electrical system, including appliances like pumps and HVAC fans. If the main power is restored while the generator is connected, it can destroy the generator and cause an electrical fire. To safely connect a generator, you must use a professionally installed transfer switch or an interlocking kit, which prevents back-feeding by disconnecting your home from the utility grid before the generator provides power.

Generators run on a variety of fuel types, ranging from natural gas to solar power. Keep in mind that fuel costs varying by type:

  • Natural gas: $2,000–$21,000 per year 

  • Liquid propane: $2,000–$21,000 per year

  • Diesel: $3,000–$20,000 per year

  • Gasoline: $500–$3,000 per year

  • Solar generator: $2,000–$25,000 per unit

  • Battery backup: $10,000–$25,000 per unit

The Sheridan, MT homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.