Top-rated pole barn builders.

Get matched with top pole barn builders in Belgrade, MT

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Belgrade, MT?

Select your specific project to find the pro for you.

TRUSTED BY BELGRADE, MT HOMEOWNERS

  • Average homeowner rating star icon3.9
    Average homeowner rating
  • Verified reviews icon34
    Verified pole barn building services reviews

Find Pole barn builders in Belgrade

Avatar for Hutch Construction
Hutch Construction
4.5(
17
)

Serving Belgrade, MT and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"Hutch Construction did a great job on an outdoor deck repair and stain project. They got the project done promptly, were responsive to our questions, and pleasant to have around. The project did end up costing more than they projected as it took longer. That was probably because there needed to be more repair work done than had been anticipated. I highly recommend this company."
Downtown kitchen remodel
Downtown kitchen remodel
Downtown kitchen remodel
Downtown kitchen remodel
Downtown kitchen remodel

+105

Response time2 days
Recommended by87%of homeowners
Avatar for TaylorMade Construction
TaylorMade Construction
5.0(
9
)

Serving Belgrade, MT and surrounding areas

Emergency services offered

Credit card accepted

General subcontracting and remodel\nSiding \nSoffit\nFacia\nRoofing \ndecks \nflooring\nkitchen/bath remodeling \ndrywall hang patch an repair/finish\ntrim\npainting interior/exterior \nlandscape/hardscape \n\n10 years experience\nLicensed and insured\nLocally Veteran owned

Remodeling - General Project
Handymen Project
Remodeling - General Project
Handymen Project
Remodeling - General Project

+52

Recommended by100%of homeowners
Avatar for Simple Works
Simple Works
4.3(
15
)

Serving Belgrade, MT and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"Taking into account the fickle fall weather here, it went exceptionally well. Our original intention was to fix a few leaks with a patch job. Upon opening up the roof, the contractor found some rotted joints and sheathing, along with water-damaged insulation. Determined it'd be better to construct a whole new roof support, Consequently, the cost went from $5400 to $6900. But we were assured the new roof would last 25-30 years. Their boss was very knowledgeable and personable, reiterating to call him anytime if any problems evolve. I believe Simple Works can easily set the standard for other roofers in Gallatin Valley (Montana)."
Recommended by92%of homeowners
Avatar for Grandchamp Painting PLLC
Grandchamp Painting PLLC
5.0(
5
)

Serving Belgrade, MT and surrounding areas

Free estimates

Credit card accepted

Pro painter with 18 years of experience. Owner is always on job site, works closely with home owners to insure they get exactly what they want done. Interior,exterior,decks,fencing,trash removal etc.

Recommended by100%of homeowners
Avatar for Paragon Montana
Paragon Montana
4.6(
9
)

Serving Belgrade, MT and surrounding areas

In business since 2003

Free estimates

Small jobs welcome

"Mike, Tony and crew did just what we talked about at the beginning. They did it while having to move a lot of stuff around in the garage throughout the project, and left it all clean and able to park our cars in the garage each night - a real benefit. They sheet rocked, taped and painted the whole large garage and installed a pull-down stair to the attic space above and made it usable for some storage. They also tiled the garage entry to the house and added a shelf area above a staircase from the garage to our lower level. After all was done, they cleaned and moved all the shelving units we had in their back in place, and took quite a bit we decided to get rid of to the dump. All the while keeping us informed about schedule and progress while being respectful and friendly. Jim"
Structural framing
Wall framing
Structural framing
Mechanical framing
Cookline wall framing

+25

Response time2 days
Recommended by88%of homeowners
Avatar for D&D Total Excavation, LLC
D&D Total Excavation, LLC
4.0(
14
)

Serving Belgrade, MT and surrounding areas

In business since 2024

Free estimates

Emergency services offered

We're a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guaranteeing your satisfaction!

Full bathroom remodel
Full bathroom remodel
Full bathroom remodel
Full bathroom remodel
Full bathroom remodel

+3

Response time11 hrs
Response rate95%
Showing 1-10 of 30
Pole Barn Builders questions, answered by experts

Whether you buy a prefabricated shed or build one depends on why you need it and where you stay. For instance, if a simple garden shed is what you’re after, it’ll be less expensive to buy one already built. But if you want a shed with windows, plumbing, and electric work, a custom-built unit might be more suited to your needs.

The construction stage is almost always the longest part of building a house. Within this stage, framing often takes the most time, lasting anywhere from one week to a couple of months, depending on the home's size, the crew, and the time of year. Other parts of the construction phase include pouring the foundation and installing doors, windows, a roof, siding, drywall, and flooring. The planning and design phase can also be very time-consuming, sometimes taking months or even years, especially for a custom home. The final finishing process, which includes painting and installing trim, is typically shorter than the construction or planning stages.

Whether it is better to buy or build a chicken coop depends on your priorities, primarily cost versus time and effort. Building your own chicken coop can be significantly more budget-friendly, often costing about half as much as buying a pre-made one. If you have the time and skills, building a coop from scratch is the most economical option. However, if your time or skills are limited, buying a kit and hiring a handyperson to assemble it can be more cost-effective than hiring a carpenter to build a custom coop from scratch. If you want a perfectly constructed coop without sacrificing your own time and energy, buying one is the easiest choice.

Whether you should choose a flat roof or a sloped roof depends on your particular situation. Flat roofs tend to be less expensive to install. However, sloped roofs have longer lifespans and stand up better to heavy snow and other inclement weather.

Keep in mind that even a flat roof needs to have a slight slope, usually around 1/2 inch for every foot. If it is completely flat, water will pool and cause damage, either from weight or leakage or rot.

It may be tempting to DIY the construction of a swing set to save money, but we don’t recommend it. Since children will use the swing set, the entire system must be solid and safe, meaning the cost savings aren’t worth potentially endangering them. Plus, most DIYers will have to build their swing sets out of wood, which won’t last as long as metal or vinyl and introduces the risk of splinters. Instead, hire a local playground equipment installer to ensure the swing set is built safely and efficiently, setting up your kids for fun for years to come.

The Belgrade, MT homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.