Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Sharon, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Sharon, MS?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Sharon

Avatar for Precision Landworks
Precision Landworks
5.0(
2
)

Serving Sharon, MS and surrounding areas

Approved

In business since 2022

Free estimates

Emergency services offered

"Matthew Bailey came out and added an irrigation zone. His bid was in line with my budget. He plans on returning to repair the section of lawn with sod at no cost to me. I highly recommend him. He also listened to me which was extremely important."
Landscape projects
Landscape projects
Landscape projects
Landscape projects
Landscape projects

+43

3 neighbors recently requested a quote
Avatar for Unparalleled Striping
Unparalleled Striping
New to Angi

Serving Sharon, MS and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

We are a locally owned and operated company that values honesty and integrity and treats your home and business as if it were our own. We offer a variety of General Contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!\n

Morrison Food
Morrison Food
Morrison Food
Morrison Food
Morrison Food

+5

Avatar for Nature's Design
Nature's Design
4.7(
33
)

Serving Sharon, MS and surrounding areas

In business since 1998

Free estimates

"He was very good in installing the sprinkler system in June 2021. He had to install it during the week it was raining but he continued until it was installed. I would highly recommend him to install an irrigation system for you at a reasonable price."
stone retainig wall
landscaping
arbor detail
abor
landscaping

+4

Response time2 days
Recommended by90%of homeowners
...
Showing 1-10 of 105
Asphalt Driveways questions, answered by experts

Since it has a smoother surface using a mixture of finer rock and sand, 41A tends to be the best asphalt grade for a driveway, especially for residential driveways. Other options are available, but more homeowners choose 41A for a smoother asphalt driveway. Talk with your asphalt driveway professional for recommendations of the best grade for your specific driveway.

In terms of durability, concrete driveways can last more than 50 years when properly maintained, compared to the typical 30 years for an asphalt driveway. However, the durability depends on the climate, base material and thickness, and thickness of the concrete or asphalt used. The longevity of concrete or asphalt driveways also depends on how well it’s maintained and the amount of wear and tear it endures.

Yes, a paved or repaved driveway can boost your home's value by increasing its curb appeal and the functionality of your outdoor space. A new driveway can add anywhere from $5,000 to $20,000 to a property's value. An old, crumbling driveway can be a red flag for potential buyers and inspectors.

The amount of value added depends on the materials used, the design, and local market conditions. Concrete is often cited as adding the most value due to its long lifespan, though asphalt may be more desirable in colder climates. The return on investment is greatest when replacing a driveway that is in poor condition; repaving a driveway that is already in good shape will not yield as significant an increase in value.

An ideal driveway gradient is between 2% and 5%. Anything lower than 1% or higher than 15% can cause problems for your car or property. A driveway with less than a 1% slope increases your likelihood of flooding and water damage, while a driveway with a 15% grade or higher can be too steep for safe traveling.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Sharon, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.