Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Enterprise, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Enterprise, MS?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Enterprise

Avatar for Reiker Land Services
Reiker Land Services
4.9(
7
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Enterprise, MS and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Reiker Land Services is upstanding in their customer service. Honesty at its’ best! Fair quotes! Reliable business and quality service. You cannot go wrong when you hire Reiker Land Services to do your small or large job! Highly recommend!"
4 neighbors recently requested a quote
Avatar for Carr Contracting
Carr Contracting
5.0(
8
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Enterprise, MS and surrounding areas

"I needed a slab for my patio. Zach and his crew came out and completed in a timely manner. They were very professional and the slab looks great. Would definitely use them again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Response time6 hrs
Response rate100%
Recommended by100%of homeowners
Avatar for Ricks Landscaping -
Ricks Landscaping -
5.0(
5
)
Gravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Enterprise, MS and surrounding areas

In business since 2019

Free estimates

Credit card accepted

"My husband and I had an extremely good experience with Rick's landscaping. Rick came to our home , he arrived at the specified time . He evaluated the work we needed done and was very professional in the manner in which he presented himself and his business. Rick's prices were competitive with others we received. Rick arrived on the day agreed with his crew . They trimmed pine trees, removed pear trees, oak trees and all stumps. When the job was completed the crew cleaned and hauled away all debris. My husband and I highly recommend Rick's Landscaping and will definitely use them again when needed."
Response time6 hrs
Response rate88%
Recommended by100%of homeowners
Bauer Services LLC
5.0(
2
)
Concrete Driveways - InstallGravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Enterprise, MS and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"Our driveway was so bad that we were not able to use it at all. and the kicker was that it is up hill. Bauer Services came out and gave us a reasonable quote. I wish i had thought to take a before picture, but it is now fixed, and looks very good also. I would recommend this company for any needed dirt work."
Response time8 hrs
Response rate100%
...
Showing 1-10 of 63
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

You should not attempt to install your own driveway. Whether working with asphalt or pavement, this is a complicated project that requires special equipment. Talk to some nearby asphalt or paving professionals and discuss your particular needs—it’s a good idea to get a few quotes and look at the company’s past work.

The Enterprise, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.