Top-rated sandblasting pros.

Get matched with top sandblasting pros in Sturgeon, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your sandblasting service project in Sturgeon, MO?

Select your specific project to find the pro for you.

TRUSTED BY STURGEON, MO HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon76
    Verified sandblasting services reviews

Find Sandblasting pros in Sturgeon

Avatar for CG Ace Contracting
CG Ace Contracting
5.0(
6
)
Exterior Surfaces - SandblastingExterior Surfaces - Sandblasting - For Business

Serving Sturgeon, MO and surrounding areas

In business since 2023

Free estimates

Credit card accepted

"What an absolute workhouse, 100% all go, no quit master of yard work. If there were more stars to give I would give. I might add that it was 95 degrees and humid as a swamp and I flat out had to insist he quit - the work was done but he wanted to tidy up more. Very respectful."
Lawn & Yard Work Project
Landscaping Project
Additional Photos
Recommended by100%of homeowners
Showing 1-10 of 17
Sandblasting Services questions, answered by experts

The cost of sandblasting depends on the scope of the project, the surface type, labor, and equipment required. Services typically cost between $50 and $80 per hour, though most professionals charge by surface area at a rate of $1.50 to $7 per square foot. Total project costs can range from $700 to $12,500, with an average homeowner spending around $3,200 to sandblast a 1,000-square-foot surface.

The best way to sand a deck is by cleaning it, sanding the boards and stairs with 60- or 80-grit sandpaper, and sanding the railings and posts with 80-grit sandpaper. You should sand in the direction of the wood grain to avoid damaging the timber. When sanding your deck, use medium pressure and aim for an even sand. Pressing too hard with a sander can damage decks, as most are softwoods.

Sandblasting removes old paint, rust, and grime efficiently, providing a clean surface for refinishing.

You can concrete can be done when it’s wet or dry. However, it’s safer when wet, as harmful dust and chemicals are present. Sanding it when dry is faster, but you’ll agitate more dust and chemicals, meaning you’ll need to be more careful.

Most projects take 1-3 days, depending on the surface area and complexity.

The Sturgeon, MO homeowners’ guide to sandblasting services

From average costs to expert advice, get all the answers you need to get your job done.