Top-rated driveway sealcoating pros.

Get matched with top driveway sealcoating pros in Pagedale, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Pagedale, MO?

Select your specific project to find the pro for you.

TRUSTED BY PAGEDALE, MO HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon103
    Verified driveway sealcoating reviews

Find Driveway sealcoating pros in Pagedale

Wells Asphalt Seal Coating and Striping
4.1(
77
)
Asphalt Sealing- For Business

Serving Pagedale, MO and surrounding areas

Approved

In business since 1998

Free estimates

Credit card accepted

"Jake was courteous and we are happy with the results of removing mold/mildew from our siding (especially on the north side of our house) and removing the discoloration of the white guttering. We will use again for these services when needed. Happy to do business with a local business."
Response time1 day
Response rate93%
14 neighbors recently requested a quote
Avatar for Topcoat Asphalt Sealing Company LLC
Topcoat Asphalt Sealing Company LLC
5.0(
14
)
Asphalt Sealing- For Business

Serving Pagedale, MO and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"Topcoat asphalt sealing co is amazing ! Great customer service ! Would 10/10 recommend to anyone needing asphalt or sealing done! I will hire them for all my future needs."
16
17
18
19
20

+28

Response time9 hrs
Response rate89%
Recommended by38%of homeowners
Avatar for NuWay Asphalt
NuWay Asphalt
5.0(
14
)
Asphalt SealingAsphalt Sealing- For Business

Serving Pagedale, MO and surrounding areas

Free estimates

"Bob is a true professional. He came to assess our driveway within two days of contacting him and installed it the same week. His crew did a great job on our driveway and provided excellent value for the work they did. Definitely recommend and will use them in the future when needed."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Response time2 days
Recommended by35%of homeowners
Avatar for JC Hardscapes LLC
JC Hardscapes LLC
5.0(
9
)
Asphalt SealingAsphalt Sealing- For Business

Serving Pagedale, MO and surrounding areas

Free estimates

"Joe & Chase recently poured my driveway and they did an absolutely phenomenal job. Very professional, friendly, and all around great workers. They were prompt, and did exactly what they promised. I would recommend these guys to absolutely anyone!"
Driveway and front porch stamp
Radius back patio
Slope protection retaining wall
Partial driveway and private walk tear out re pour
Brick private walk tear out and pour

+42

Recommended by100%of homeowners
...
Showing 1-10 of 70
Driveway Sealcoating questions, answered by experts

A good rule for all homeowners is to seal every driveway to protect it. Wait at least three months to seal an asphalt driveway and one month to seal a concrete driveway. You know it’s time to reseal your driveway when it shows obvious signs of wear and tear. It may appear as fading or discolored asphalt, small cracks, and oil stains. If you notice that one area of your driveway seems to dry slower than others, it’s time to reseal.

Access to commercial-grade products and equipment, ensuring thorough coverage and long-lasting protection.

Ideally, you should seal your driveway when there won’t be rain for several days, but at a minimum, there can’t be rain for at least 24 hours. If it rains shortly after you seal your driveway, the water can wash away the sealer and render your work useless. You’ll have to wait for your driveway to dry out and try applying again. Note that some sealers—like oil-based sealers or specialty fast-drying sealers—may cure faster. Ask your contractor for information on timing before the install, and if there’s rain in the forecast, postpone the job.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Yes, sealing is included to prevent staining and moisture absorption, depending on the stone type.

The Pagedale, MO homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.