Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Caruthersville, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Caruthersville, MO?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Caruthersville

A & W Asphalt And Sealing
4.0(
12
)
Asphalt SealingGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Caruthersville, MO and surrounding areas

In business since 1985

Free estimates

"Wayne came to our home to survey the repairs the same day I called and requested a quote. The A&W crew arrived a few days later and made the repairs in just a couple of hours. They were polite, professional and easy to work with. I would recommend A&W to anyone needing asphalt work."
Response time3 days
Recommended by81%of homeowners
Avatar for Stanley's Home Improvement
Stanley's Home Improvement
3.3(
12
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+5 more

Serving Caruthersville, MO and surrounding areas

Free estimates

Emergency services offered

"Schedule to do the work at noon on Saturday. Did call at 11:00 a.m. because they had a tire blowout and let me know he would be a couple hours late. But they did show up when they said they would. Tree was trimmed excellently. Just what I wanted. All of the haul away was done. Yard was cleaned up exactly the way it looked before arrival. Could not be happier. Are planning on having them back to trim another tree."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by77%of homeowners
Showing 1-10 of 28
Asphalt Driveways questions, answered by experts

You can expect your asphalt pavement to last anywhere from 20 to 30 years, or 25 years on average. The life expectancy of your asphalt driveway depends on the climate, the amount of traffic, and how well you maintain it. While you can’t necessarily control some of these factors, you can control the amount of maintenance effort you put into your driveway. 

To prevent your asphalt from deteriorating prematurely, you should follow a good maintenance routine involving regular cleaning, reparation work, and resealing.

Like all driveway materials, asphalt can crack in the wrong conditions and with age. Many things can cause asphalt to crack, including shifting soil or settling under the foundation. Other common causes are driving oversized vehicles on the asphalt, tree roots, and using rock salt during the snowy season. Proper installation and sealing the driveway every 10 years can help prevent cracks.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Caruthersville, MO homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.