Top-rated basement remodelers.

Get matched with top basement remodelers in Battlefield, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Battlefield, MO?

Select your specific project to find the pro for you.

TRUSTED BY BATTLEFIELD, MO HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon23
    Verified basement remodels reviews

Find Basement remodelers in Battlefield

Avatar for Fender Brothers Construction
Fender Brothers Construction
0.0(
1
)

Serving Battlefield, MO and surrounding areas

Approved

In business since 1984

Free estimates

Credit card accepted

Fender Brothers Construction, has been in business over 38 years and has served the Springfield area with pride. From concrete driveways to new custom built homes, Fender Brothers Construction is your top choice. Locally owned and operated, Fender Brothers Construction, has been focusing on quality work and exceptional customer service since they began doing business. Call today for your free estimate.

Response time5 hrs
Recommended by100%of homeowners
Avatar for Webster Construction
Webster Construction
New to Angi

Serving Battlefield, MO and surrounding areas

Approved

Small jobs welcome

I’m a young outgoing individual, I’ve had a full time job since I was 14 trying every trade you can think of I have several years of plumbing under my belt, I’m a skilled framer, I’ve done electric for several years and even done mechanical work, I found a love and passion for handyman work and decided I was ready to take the leap on my own! If you need anything done no job is to big or small don’t be afraid to reach out I’d love to come check it out for you!!

Avatar for Diederich Construction LLC
Diederich Construction LLC
New to Angi

Serving Battlefield, MO and surrounding areas

Approved

Free estimates

Warranties offered

Diederich Construction LLC is a bathroom remodeling and tile shower specialist serving Springfield, MO and surrounding areas. We focus on high-quality tile work, custom showers, and curbless shower installations using proven waterproofing systems. Whether you’re updating a bathroom or building a custom walk-in shower, we deliver clean, professional results with attention to detail. Free estimates available.

Pfeifer home remodeling
5.0(
10
)

Serving Battlefield, MO and surrounding areas

In business since 2007

Free estimates

Credit card accepted

"Stephen was very professional. They arrived on time every day, and always asked questions each step of the way to ensure we were happy with the outcome. When we didn't like the cabinets that were picked out for either side of the fireplace, Stephen custom built ones to our liking. We were very please with his services, would definitely hire him again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Recommended by100%of homeowners
...
Showing 1-10 of 107
Basement Remodel questions, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Professional remodelers streamline the process, manage permits, and handle renovations efficiently—significantly mitigating risk while maintaining standards.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Installing a bathroom in a basement isn’t a project for most homeowners. Many parts—plumbing, electricity, and carpentry—go into this project, each requiring expert-level knowledge and tools. One miscalculation can lead to very expensive repairs. Plus, some homeowner’s insurance might not pay for damages caused by a homeowner DIYing this project. You can protect yourself by allowing the pros to complete this job for you. 

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

The Battlefield, MO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.