Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Winona, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Winona, MN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Winona

Denny's Excavating
New to Angi
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Winona, MN and surrounding areas

Approved

In business since 2020

Free estimates

Offers commercial services

Denny's Excavating is dedicated to providing our customers with the best quality and craftsmanship. We are here to build relationships with our customers and communities and to provide our employees with a great place to work. Our pledge is to create successful relationships with our customers, employees and community by building trust, treating every project with the utmost integrity and exceeding expectations.

Avatar for ACT Landscaping LLC
ACT Landscaping LLC
3.8(
44
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install+1 more

Serving Winona, MN and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"The owner, Thomas Burke, was great to work with in all respects.   To start with he specified concrete that was stronger than what I wanted and this really pleased me.   It told me he was willing to go above and beyond my requirements or minimums.   He started with grading and removing dirt so he could build a retaining wall to hold back the grade for a new driveway.  The guy he sent out worked very hard and did a near perfect job on the new wall.   Like any construction project there were a few unknowns but he worked around these problems.   Then he poured the new garage addition slab and finished it for me.   Unfortunately it started to rain just before the final finish hardened so they had to redo some areas.  Didn't come out quite as good after the rain but very acceptable.   Then they immediately poured the driveway slab.   No new showers so this came out perfectly.  The concrete company sent out the second truck too soon so there was not enough time between pours to really get set.   I think this second pour therefore did not quite get the grade Tom wanted. The driveway slab was pitched to drain water to match an adjacent existing slab and this did not quite work out.   I have a small area on the new drive slab that holds water after a rain.  It was a tough job to slope it right and it is within a quarter inch of draining.   Like I said they were still grading the driveway when the truck showed up and I really think this cause the slight glitch.
I have some more work to do next summer and am really looking forward to having Tom back knowing I will get a good price, a good job, and quick service done right.  I would highly recommend ACT Contracting to anyone.
"
Walls,Pavers
Patio on the hill
Patio on the hill
Patio on the hill
Pools,Pavers,Patio

+45

Recommended by74%of homeowners
Showing 1-10 of 29
Asphalt Driveways questions, answered by experts

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

With proper maintenance, asphalt milling driveways can last 30 years or more. Over time, you’ll need to regularly sealcoat your driveway. You should also have your driveway inspected every few years and make any repairs as soon as they are necessary; this will prolong the lifespan of your driveway.

Recycled asphalt is a durable choice for a driveway, but doesn’t have the same appearance and low maintenance as standard asphalt. For long driveways in rural communities, recycled asphalt can make a great choice. Recycled asphalt is 20% to 30% percent less expensive than standard asphalt and is better for the environment. 

The Winona, MN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.