Top-rated rototilling pros.

Get matched with top rototilling pros in Sherburn, MN

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Sherburn, MN?

Select your specific project to find the pro for you.

Find Rototilling pros in Sherburn

Richards Forestry

No reviews yet

Richards Forestry

No reviews yet
18 years of experience

TREE SREVICE -PESTICIDE APPLICATOR-EXCAVATING-BOBCAT WORK-PONDS-AND WATER FALLS-YARD SERVICE DOCK SERVICE SHORELINE RESTORATION-RIP-RAP RETAINING WALLS BOULDER WALLS TRUCKING

TREE SREVICE -PESTICIDE APPLICATOR-EXCAVATING-BOBCAT WORK-PONDS-AND WATER FALLS-YARD SERVICE DOCK SERVICE SHORELINE RESTORATION-RIP-RAP RETAINING WALLS BOULDER WALLS TRUCKING


Rototilling questions, answered by experts

Water pooling, uneven surfaces, or basement leaks are indicators.

Mobile homes need releveling every so often to maintain their structural integrity. Most mobile home manufacturers recommend releveling every three to five years. To keep the quality of your mobile home up for years and to avoid deterioration over time, proper maintenance is key.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Yes, it’s always a good idea to fertilize your lawn before a major leveling project. This step gives your grass the nutrients necessary for healthy growth, helping it recover and replenish itself faster. However, you should do this at least three weeks in advance, as the leveling process can disturb the newly-applied fertilizer.

Typically 1-3 days, depending on property size and terrain condition.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"