Top-rated generator install pros.

Get matched with top generator install pros in Mountain Lake, MN

Enter your ZIP and get matched with up to 5 pros

Find Generator install pros in Mountain Lake



My Classic Car Trader LLC

312 Prospect Ave
2.00(
1
)

My Classic Car Trader LLC

312 Prospect Ave
2.00(
1
)
53 years of experience

Sales, Service & Rebuilding of Antique and Classic Car Components such as, Carburetors, Starters, Generators, Fuel Pumps, Double & Single Action Fuel Pump Rebuilding, Water Pumps, Hydraulic Top Pumps, Distributors, and DELCO Knee Action Shocks, We also carry a complete line of NOS and NORS parts. We offer FREE Technical advice for any YEAR Classic Car 609-462-7412

"Beware. They charged me double shipping even after I told them I would wait so I wouldn’t have to pay two shipping fees. The last item was a fuel pump that I had a problem with. I have made 4 calls to ask for help with no return call. Poor"

Frank H on July 2020

Sales, Service & Rebuilding of Antique and Classic Car Components such as, Carburetors, Starters, Generators, Fuel Pumps, Double & Single Action Fuel Pump Rebuilding, Water Pumps, Hydraulic Top Pumps, Distributors, and DELCO Knee Action Shocks, We also carry a complete line of NOS and NORS parts. We offer FREE Technical advice for any YEAR Classic Car 609-462-7412

"Beware. They charged me double shipping even after I told them I would wait so I wouldn’t have to pay two shipping fees. The last item was a fuel pump that I had a problem with. I have made 4 calls to ask for help with no return call. Poor"

Frank H on July 2020

Generator Install questions, answered by experts

If your home already has a grinder pump and you’re still noticing issues (like frequently clogged toilets and sinks), it could be time to upgrade your grinder pump. Start by checking your existing horsepower. If there are four or fewer people living in your home, using a 1/2-horsepower grinder pump should be sufficient. Larger households should consider investing in a 1-horsepower grinder pump to maximize wastewater removal efforts.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

To reduce AC startup power for a whole-house generator, install a soft start kit or hard start capacitor, which lowers the initial surge by gradually ramping up the compressor. Using a smart load manager can also help by staggering startup loads, preventing a system overload and future costly repairs.

These advanced generators use a key fob or a smartphone app to remotely start, which is ideal for getting power back on immediately without venturing outside. This feature is more common on whole home generators, but you may be able to find it on large portable generators, too.

Yes, in some locations, it is required by the National Electric Code (NEC) to have a transfer switch installed for electrical emergencies. In addition to following electrical code, generator transfer switches ensure your home is fully protected during a power outage. By switching the power from the main breaker to the generator breaker, you can seamlessly operate your HVAC, lights, appliances, devices, and more during an emergency. 