Top-rated rototilling pros.

Get matched with top rototilling pros in Badger, MN

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Badger, MN?

Select your specific project to find the pro for you.

Find Rototilling pros in Badger


Rototilling questions, answered by experts

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

An aboveground pool should be level within 1 inch—and it starts to become unsafe after a couple of inches. Any slope will lead to an uneven distribution of water, which will put pressure on your pool’s structure, wearing down the pool liner. In certain cases, it could cause your pool to collapse. Even if you’re within a safe window, you may still notice that the water level is uneven.

Periodic checks for erosion and proper drainage function ensure lasting results.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

Yes, such as sod installation and erosion control for comprehensive site improvement.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.