Top-rated solar panel pros.

Get matched with top solar panel pros in Climax, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Climax, MI?

Select your specific project to find the pro for you.

Find Solar panel pros in Climax

Avatar for CUSTOM HOME SERVICES
CUSTOM HOME SERVICES
4.8(
6
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Climax, MI and surrounding areas

In business since 2012

Free estimates

Credit card accepted

"The technicians did a great job on the installation of the solar panels and the equipment that goes along with the panels. They were total professionals! They were also instrumental in getting everything up and running the way it should. Custom Home Service did a great job taking care of the details, and always had time for any of our questions. They did a great job!!"
Recommended by100%of homeowners
Showing 1-10 of 18
Solar Panels questions, answered by experts

No, you cannot turn on a new solar system before inspection. The inspector checks that the system is correctly connected to the grid and that safety components and features are in place. This process prevents problems on the electrical grid and offers protection against fire in your home. 

Your local utility company may also require inspection documentation before you can connect to the grid. An inspection can ensure solar power efficiency and determine how you might increase it.

The average homeowner needs around 22 solar panels, but the exact number depends on your monthly energy consumption. Your solar professional should size your array to offset your consumption, meaning you’ll need fewer panels if you use below-average amounts of electricity, or more than 22 if you use above-average amounts of electricity. The number of panels also depends on the output of each panel. The average is around 400 watts, but you might need more panels if you install less capable equipment. Since there are so many variables, you should have a professional size your system.

Solar panels should get at least four to six hours of direct sunlight daily. It’s even better if sunlight reaches panels between the peak hours of 10 a.m. and 3 p.m. This is enough to power a home, depending on your solar system’s size and energy needs. Remember that panels will generate some power under cloudy skies or in the shade, and many systems compensate for lower sun exposure by drawing energy from the grid or battery storage.

While you can minimally overshoot the number of solar panels you need for your home, it's not smart to go too far. Not only is the extra cost unnecessary, but your state may put caps on how much energy your home can produce and send back to the grid. It is always best to work with a solar energy professional to determine the best system size for you.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

The Climax, MI homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.