Top-rated rototilling pros.

Get matched with top rototilling pros in Woodstock, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Woodstock, ME?

Select your specific project to find the pro for you.

Find Rototilling pros in Woodstock


kinney oddjobs

No reviews yet

kinney oddjobs

No reviews yet
25 years of experience

small business owner with three full time employees and i have three others who work with me if i need them.billing is done for credit card payments through paypal for most of my out state customers who are for vacation/summer months and i accept for others cash,check and credit cards. i have discounts for vets,first time customers,repeat customers,senior disc.

small business owner with three full time employees and i have three others who work with me if i need them.billing is done for credit card payments through paypal for most of my out state customers who are for vacation/summer months and i accept for others cash,check and credit cards. i have discounts for vets,first time customers,repeat customers,senior disc.



Rototilling questions, answered by experts

Typically 1-3 days, depending on property size and terrain condition.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

Professionals who complete perc tests can usually do them in a single day. Including excavating to expose the test site, filling the hole with water, and monitoring it while it drains, you can expect the test to take between four and eight hours total. It’s possible that you’ll get the results the same day, but some companies may take a few days to get official results.

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.