Top-rated rototilling pros.

Get matched with top rototilling pros in Hartford, ME

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Hartford, ME?

Select your specific project to find the pro for you.

Find Rototilling pros in Hartford


kinney oddjobs

236 Temple Hill Rd
No reviews yet

kinney oddjobs

236 Temple Hill Rd
No reviews yet
25 years of experience

small business owner with three full time employees and i have three others who work with me if i need them.billing is done for credit card payments through paypal for most of my out state customers who are for vacation/summer months and i accept for others cash,check and credit cards. i have discounts for vets,first time customers,repeat customers,senior disc.

small business owner with three full time employees and i have three others who work with me if i need them.billing is done for credit card payments through paypal for most of my out state customers who are for vacation/summer months and i accept for others cash,check and credit cards. i have discounts for vets,first time customers,repeat customers,senior disc.



Rototilling questions, answered by experts

Many ways to landscape a steep slope on a budget exist. Avoiding expensive retaining wall construction is the first step. Consider creating a rocky slope with boulders or large stones, or think about planting perennials that return every year with a single investment. Transplanting small trees from elsewhere on your property is also possible and can help to stabilize steep slopes without purchasing new ones. 

DIY landscaping is possible, but professional services offer expertise in selecting appropriate plants and designing functional spaces that complement the natural environment and adhere to local regulations.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Environmental considerations include native plant selection, wildlife habitation, erosion prevention measures, and managing water runoff patterns to protect the lakefront ecosystem.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"