Top-rated basement remodelers.

Get matched with top basement remodelers in Warren, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Warren, ME?

Select your specific project to find the pro for you.

Find Basement remodelers in Warren

Avatar for Bangor Abatement, Inc.
Bangor Abatement, Inc.
4.5(
2
)
Basement - Remodel

Serving Warren, ME and surrounding areas

Approved

In business since 2001

Free estimates

Emergency services offered

"They did a good job especially considering how brittle my old siding had become over the years. I’m pleased with their work and the price was right. I plan to hire them to do a couple more small jobs that I’m to old to do myself."
6 neighbors recently requested a quote
Avatar for Blue spruce fence and deck
Blue spruce fence and deck
4.7(
34
)
Basement - Remodel

Serving Warren, ME and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"Very happy with Blue spruce property management. They made a appointment for an estimate and was here on time. They worked with me on my concerns about weather and temperature issues. They came one day and finished the next. The quality of the fence was great much better than home depot. Good quality posts and very little clean up when they were done. Would highly recommend them."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Response time2 days
Recommended by96%of homeowners
Avatar for New England Home Renovations LLC
New England Home Renovations LLC
4.0(
311
)
Basement - Remodel

Serving Warren, ME and surrounding areas

In business since 1983

Free estimates

Emergency services offered

"This project was supposed to be "phase one" of three projects that we hired NE Renovation to complete.  On day one, the basement was prepped - all carpeting was covered and baseboard heating covers were removed.  Sheetrock was supposed to be installed on the next day, but due to a serious injury to the sub-contractor, that was not done.  Instead, demolition work began on what was supposed to be "phase two" of the project - the remodeling of a bathroom.  We had not been expecting this change in schedule and to be fair, neither did anyone else.  The basement project was put on hold until an alternate plan could be made.  A few weeks later, work began again on the basement.  The sheetrock was installed very well and in quick time.  The plaster work was completed perfectly which was no small task given the length of the walls. Additionally, the paint job was done perfectly.  The new six-panel doors, wall mounted television, upgraded lighting, and new baseboard heating covers helped complete the transition of the space from 1970 to 2012!

The value we received from this project has exceeded our expectations.  We added a pool table and two sectional sofas to complete our new recreational space.  It serves as a great "man cave" as well as a great place for family and friends to hang out.  NE Renovations did a great job renovating our basement."
Before
After's
New boiler install
Removal of cast Iron to PVC.
Additional Photos

+37

Recommended by89%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Warren, ME and surrounding areas

In business since 2006

Credit card accepted

"It was fine. The original design didn’t meet my needs based on the information I provided them. However, they revised the plans which worked out better for me. They were able to get the first draft to me pretty quickly."
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
B&R Builders
5.0(
4
)
Basement - Remodel

Serving Warren, ME and surrounding areas

In business since 2015

Free estimates

Credit card accepted

We're a locally owned and operated company with over 18 years of industry experience. We value honesty and integrity in all aspects of our business. We offer a variety of home improvement services that are customized to each individual project. We specialize in additions and remodels, carpentry, decks, porches, and a variety of other projects. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We offer a one year guarantee on all jobs performed. Estimates are free and there are no up front costs to our home and business owners. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

OUR WORK
OUR WORK
OUR WORK
OUR WORK
OUR WORK

+13

Response time3 hrs
Recommended by66%of homeowners
...
Showing 1-10 of 63
Basement Remodel questions, answered by experts

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Yes, adding a walkout basement will usually bump up your property value. Most homeowners prefer walk out basements because the exposed wall that’s level with the ground provides more utility via a ground-level exterior entrance, and they can fit full windows, which adds natural light and ventilation to the basement area. The only exception might be in areas prone to tornadoes, as walkout basements aren’t as safe as regular basements during a tornado, particularly if they include large windows or glass sliding doors.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

When choosing materials for finishing basement walls, consider factors such as moisture resistance, durability, and fire resistance. Opt for materials specifically designed for basement environments, like moisture-resistant drywall or cement board. Insulation with vapor barriers can help regulate temperature and prevent condensation. Consider using mold-resistant paints or coatings. 

Research and consult with experts to select materials that are suitable for your specific basement conditions and intended use. Prioritize quality and compatibility to achieve long-lasting and aesthetically pleasing results.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

The Warren, ME homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.