Top-rated basement remodelers.

Get matched with top basement remodelers in Poland, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Poland, ME?

Select your specific project to find the pro for you.

Find Basement remodelers in Poland

Avatar for K&A Renovations, LLC
K&A Renovations, LLC
4.9(
24
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Small jobs welcome

"Kaydn has been very responsive as our renovation and repair needs evolve. We certainly aren’t done yet, but we will keep this company involved as we continue to work forward through some major renovations. We just started with them for essential repairs before embarking on the more ambitious projects. Kaydn has proven himself as very knowledgeable and capable. More to come."
Response time1 day
Response rate89%
13 neighbors recently requested a quote
Avatar for Sunapee Builder
Sunapee Builder
4.9(
38
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

In business since 1988

Free estimates

Customers say: Quick response

"Don and his assistant Clay did a great job installing interior closet doors and a stair railing in my home. They were great to work with from start to finish and I highly recommend them."
Lorello
Fralich
VanBrunt
Lorello
Blanchard

+36

Response time2 days
Recommended by63%of homeowners
Avatar for Leviathan Group LLC
Leviathan Group LLC
5.0(
9
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

In business since 1996

Free estimates

Offers commercial services

"We had our kitchen completely remodeled by Hutchins and Son. Owner Don is great to work with. He was able to provide us with the exact custom cabinets and custom color we were looking for. I highly recommend Don and his son ."
Cabinet
Kitchen Island
Custom Cabinets
Pot Hangers
The Leviathan Group

+9

Response time2 days
Response rate95%
5 neighbors recently requested a quote
Avatar for 506 Designs & Carpentry LLC
506 Designs & Carpentry LLC
4.4(
7
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

Free estimates

Emergency services offered

"Brendon replaced my kitchen subfloors and put a new linoleum, full trim all the way around, a bathroom bifold, and even put a special touch to the trim, so I'd think of my late farther who had worked in that same kitchen many moons ago. Brendon had some challenges with old school techniques, but worked long and hard to end with flooring, trim and doorway that was beautiful and I was pleased with the outcome."
40 neighbors recently requested a quote
Avatar for Innovative Construction
Innovative Construction
3.7(
32
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Greg & his crew were very professional. Greg communicated exactly what the cost and date of completion would be. He updated us on a regular basis on how the project was moving along and finished ahead of schedule. I would highly recommend Innovation construction for your home project. We look forward to using Greg again on our next renovation. Tom & Denise Rooney - Bath, ME"
Before
Deck Repair
Deck Repair
Before
MIDWAY

+9

Response time3 days
8 neighbors recently requested a quote
Recommended by45%of homeowners
Avatar for Next Level Design
Next Level Design
New to Angi
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

Small jobs welcome

Offers commercial services

@NextLevelDesign.us , we specialize in high-quality kitchen remodeling and renovation services for homeowners throughout Portland and Southern Maine. We help clients transform outdated or inefficient kitchens into functional, beautiful spaces that add value and comfort to their homes.\n\nFrom complete kitchen remodels to custom cabinetry, countertops, flooring, tile work, and lighting, we manage every phase of the project with attention to detail and clear communication. Our goal is to deliver craftsmanship you can see, timelines you can trust, and results that exceed expectations.\n\nWe work closely with each homeowner to understand their vision, budget, and lifestyle needs—then execute with precision. Whether you are modernizing your kitchen, improving layout and storage, or preparing your home for resale, Next Level Design is committed to quality results and customer satisfaction.

Renderings
Two tone
Outdated Kitchen
Under Construction
Complete

+3

...
Showing 1-10 of 132
Basement Remodel questions, answered by experts

The difficulty of adding a basement to an existing house can vary depending on the house’s location, the size of the basement, and the type and condition of the existing foundation. Adding a basement is a job best handled by the pros, so you’ll need to enlist professional help for this project.

If you’re not sure which method of raising the ceiling is best for you, here are a couple of considerations to help you make that decision. A professional ceiling company will be able to help you determine the best option for your home.

  • How long you are planning to live there: although raising the basement ceiling will increase the value of your home, if you’re planning to sell the house, then go for raising the house.

  • The condition of the foundation: to lower the floors, your foundation has to be intact whereas raising the house will allow you to restore the damaged foundation.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Adding a bathroom to your basement can increase your home value since homes with multiple bathrooms sell for more. The return on investment (ROI) for a basement bathroom is 50% to 75%. The actual return varies with your home and location. Adding a half bath to your home increases the value by 2.9% while finishing a basement increases the home value by 6.6%.

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

The Poland, ME homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.