Top-rated basement remodelers.

Get matched with top basement remodelers in Poland, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Poland, ME?

Select your specific project to find the pro for you.

Find Basement remodelers in Poland

Avatar for Sunapee Builder
Sunapee Builder
4.9(
38
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

In business since 1988

Free estimates

Customers say: Quick response

"Fabricated and installed new wooden interior staircase . This replaced a metal staircase. Looks beautiful and allows more light into the home."
Lorello
Fralich
VanBrunt
Lorello
Blanchard

+36

Response time2 days
3 neighbors recently requested a quote
Recommended by63%of homeowners
Avatar for Leviathan Group LLC
Leviathan Group LLC
5.0(
9
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

In business since 1996

Free estimates

Offers commercial services

"We had our kitchen completely remodeled by Hutchins and Son. Owner Don is great to work with. He was able to provide us with the exact custom cabinets and custom color we were looking for. I highly recommend Don and his son ."
Cabinet
Kitchen Island
Custom Cabinets
Pot Hangers
The Leviathan Group

+9

Response time2 days
Response rate95%
4 neighbors recently requested a quote
Avatar for Integrity Builders
Integrity Builders
5.0(
5
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

In business since 2000

Free estimates

Offers commercial services

"Custom 32’x36’ Goldiva Goldens LLC showroom plus 14x32 pergola and 14x67 pergola plus a small bathroom in the basement; re-tile basement area too. Scott Turcott, Tyler & Michael are great to work with, great communications. In 20 months of building my showroom there wasn’t a single disagreement. If something “didn’t work” as envisioned, like an incinerator toilet that burned the ash, Scott gave me the options. They’re a fabulous team!!"
North Yarmouth Addition
North Yarmouth Addition
North Yarmouth Addition
North Yarmouth Addition
North Yarmouth Addition

+46

1 neighbors recently requested a quote
Recommended by33%of homeowners
Avatar for 506 Designs & Carpentry LLC
506 Designs & Carpentry LLC
4.4(
7
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

Free estimates

Emergency services offered

"Brendan did a great job on assembling four pieces wood furniture. He had to construct a wood part that was missing from the materials. It turned out to be rather complex work and we appreciated his attention to detail. Hope we can work with him again!"
31 neighbors recently requested a quote
Avatar for Innovative Construction
Innovative Construction
3.7(
33
)
Basement - Remodel

Serving Poland, ME and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Greg & his crew were very professional. Greg communicated exactly what the cost and date of completion would be. He updated us on a regular basis on how the project was moving along and finished ahead of schedule. I would highly recommend Innovation construction for your home project. We look forward to using Greg again on our next renovation. Tom & Denise Rooney - Bath, ME"
Before
Deck Repair
Deck Repair
Before
MIDWAY

+9

Response time3 days
6 neighbors recently requested a quote
Recommended by43%of homeowners
...
Showing 1-10 of 132
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes. Renovating your basement has a return on investment (ROI) of 75%, meaning your remodel investment will significantly increase the value of your home. Besides the ROI, your family can enjoy a larger, more usable space while you live there. 

There are several small, inexpensive upgrades you can make to upgrade your basement. Although you still need to adhere to building codes and obtain permits when necessary, you can complete small but mighty tasks like painting the masonry walls and installing entertainment devices to make the space more usable. 

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

The Poland, ME homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.