Top-rated basement remodelers.

Get matched with top basement remodelers in New Gloucester, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in New Gloucester, ME?

Select your specific project to find the pro for you.

Find Basement remodelers in New Gloucester

Avatar for Sunapee Builder
Sunapee Builder
4.9(
38
)
Basement - Remodel

Serving New Gloucester, ME and surrounding areas

Approved

In business since 1988

Free estimates

Customers say: Quick response

"Don and his assistant Clay did a great job installing interior closet doors and a stair railing in my home. They were great to work with from start to finish and I highly recommend them."
Lorello
Fralich
VanBrunt
Lorello
Blanchard

+36

Response time2 days
3 neighbors recently requested a quote
Recommended by63%of homeowners
Avatar for Woodland Building Company
Woodland Building Company
5.0(
2
)
Basement - Remodel

Serving New Gloucester, ME and surrounding areas

Approved

In business since 2016

Warranties offered

Small jobs welcome

"I highly recommend Foley Construction! Drew was reliable, professional and did a beautiful job installing my hardwood floors and trim. In a time when you can’t even get a contractor to return a call, Drew was very dependable and delivered a quality, on-time job as promised. He takes pride in his work and pleasing his customers. I look forward to working with Foley Construction on my future home improvement projects!"
Interior Trim
Interior Trim
Interior Trim
Interior Trim
Interior Trim

+33

Response time3 hrs
3 neighbors recently requested a quote
Recommended by50%of homeowners
Avatar for Integrity Builders
Integrity Builders
5.0(
5
)
Basement - Remodel

Serving New Gloucester, ME and surrounding areas

Approved

In business since 2000

Free estimates

Offers commercial services

"Custom 32’x36’ Goldiva Goldens LLC showroom plus 14x32 pergola and 14x67 pergola plus a small bathroom in the basement; re-tile basement area too. Scott Turcott, Tyler & Michael are great to work with, great communications. In 20 months of building my showroom there wasn’t a single disagreement. If something “didn’t work” as envisioned, like an incinerator toilet that burned the ash, Scott gave me the options. They’re a fabulous team!!"
North Yarmouth Addition
North Yarmouth Addition
North Yarmouth Addition
North Yarmouth Addition
North Yarmouth Addition

+46

3 neighbors recently requested a quote
Recommended by33%of homeowners
Avatar for Opulent Builders LLC
Opulent Builders LLC
4.5(
8
)
Basement - Remodel

Serving New Gloucester, ME and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

Dominic is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Bathroom Dormer Remodel
Bathroom Dormer Remodel
Bathroom Dormer Remodel
Bathroom Dormer Remodel
Bathroom Dormer Remodel

+13

5 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for 506 Designs & Carpentry LLC
506 Designs & Carpentry LLC
4.4(
7
)
Basement - Remodel

Serving New Gloucester, ME and surrounding areas

Approved

Free estimates

Emergency services offered

"Brendon replaced my kitchen subfloors and put a new linoleum, full trim all the way around, a bathroom bifold, and even put a special touch to the trim, so I'd think of my late farther who had worked in that same kitchen many moons ago. Brendon had some challenges with old school techniques, but worked long and hard to end with flooring, trim and doorway that was beautiful and I was pleased with the outcome."
22 neighbors recently requested a quote
...
Showing 1-10 of 151
Basement Remodel questions, answered by experts

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Finishing a basement can provide a great return on investment, by increasing the market price of your home when you want to sell. Beyond that, there are many reasons to finish your basement. Doing so expands the usable square footage of your home, so you can enjoy it more, even as your family grows. Renovating your basement costs less in terms of time, energy, and money than having to search for and buy a new home.

The New Gloucester, ME homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.