Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Limestone, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Limestone, ME?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Limestone

Wicked Cool Concrete
1.0(
4
)
Concrete Finishing, Overlays & Coloring - ApplyConcrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Limestone, ME and surrounding areas

In business since 1993

Free estimates

At Wicked Cool Concrete, we focus on custom, decorative concrete creations. We specialize in the installation of decorative concrete flooring, countertops, and exterior concrete hardscaping.\n\nWe have been on the forefront of the custom and decorative concrete industry in New England for more than 30 years.\n\nWe truly are grateful and inspired by the opportunities we have had working with our clients over the years, and look forward our future creations.\n

 Mettalic Epoxy for retail space
 Loft space stain
 acid stain with custom scoring
 acid stain boutique
Contemporary Kitchen - Sink Brown Stainless Steel Appliances

+4

Recommended by100%of homeowners
Epoxy Flooring questions, answered by experts

Installation typically takes 2-5 days, including preparation, pouring, and curing time.

Concrete coatings protect surfaces from wear, physical damage, abrasion, stains, spills, moisture, and weather. This protection extends the life of the concrete, adds durability, and can also improve aesthetics and safety.

Epoxy coatings for garage floors offer a variety of finish and design options, including:

  • Decorative colored flakes: $10 per 250-pound bag

  • Metallic epoxy: $5–$12 per square foot

  • Rock or stone epoxy: $100 per gallon

  • Acrylic and poly-acrylic sealants: $0.85–$1.15 per square foot

  • Polyurethane sealant: $0.95–$1.10 per square foot

  • Polyurea sealant: $150 per gallon

Resurfacing a garage floor takes about eight hours on average, with another couple hours over three days to do the epoxy. Epoxy goes on in three coats, with each coat taking 24 hours to dry and cure. You’ll need to keep foot and vehicle traffic off of your garage floor for around 4 days in total when replacing your garage floor, so be sure to plan ahead before you start. This is a great time to organize your garage since you’ll need to move everything out to apply the epoxy.

The prevention steps are essentially the same, no matter the patio material. Keep the surface clean and maintained. Ensure there's no debris buildup, and cover the whole thing in a quality sealant. If it's the start of a season or it's been a while since you've cleaned the area, use a pressure washer.

The Limestone, ME homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.