Top-rated subcontractors.

Get matched with top subcontractors in Pollock, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Pollock, LA?

Select your specific project to find the pro for you.

TRUSTED BY POLLOCK, LA HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon328
    Verified subcontracting services reviews

Find Subcontractors in Pollock

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Pollock, LA and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Leon Glenn Angel
4.0(
15
)
Major Home Repairs (General Contractor)

Serving Pollock, LA and surrounding areas

In business since 1985

Credit card accepted

"Leon Angel did a fantastic job removing the stand-alone shower in our master bath and replacing it with a beautiful tile shower with sliding glass doors, a pocket shelf, and a marble soap dish. He did everything we asked excellently and was very accommodating to the needs and desires of my wife to add butterfly tiles to the décor. His performance was outstanding and the final project turned out great!"
millwork
Kitchen Upgrades
kitchen
kitchen up grades
counter tops

+11

Response time2 days
Recommended by91%of homeowners
Avatar for Morrow Builders LLC
Morrow Builders LLC
5.0(
4
)
Major Home Repairs (General Contractor)

Serving Pollock, LA and surrounding areas

In business since 2007

Credit card accepted

"It was very good. They did exactly what they said they would do. They were very prompt. They brought the materials on time. They did the work on time. Their workmanship was excellent. They cleaned up after themselves. They did a great job all around."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+153

Recommended by100%of homeowners
Avatar for Jason Cooper
Jason Cooper
4.2(
5
)
Major Home Repairs (General Contractor)

Serving Pollock, LA and surrounding areas

"Mr. Cooper was well experienced and very knowledgeable in all facets of home improvement work and technologies. He was responsible, reliable, dependable, honest and punctual. All his work was done in a highly professional manner. I would highly recommend him for any work that one may employ him in doing. His skills and capabilities go far beyond handyman work. It was truly an honor for me to employ him to complete the work as he is a fellow U.S. Army Veteran!! When hiring Mr. Cooper; YOU ARE HIRING THE VERY BEST!!!!"
Sliding glass doors
Rotten porch section
Door replacement
Painted and completed
Additional Photos

+10

Recommended by80%of homeowners
Showing 1-10 of 38
Subcontractors questions, answered by experts

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

Most Greek Revival architecture homes are one and a half to two stories, depending on the footprint, which sets them apart from some Federal architecture homes that are three stories. The gabled roof on the second floor can sometimes cut into the living space, especially on smaller homes of this style, which leaves a much smaller living area upstairs.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Yes, professionals will offer tailored solutions to fit architectural and personal style preferences.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

The Pollock, LA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.