Top-rated above ground pool installation pros.

Best above ground pool installation pros near Montegut, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Montegut, LA?

Select your specific project to find the pro for you.

Top-Rated Above ground pool installation pros in Montegut - Updated Nov 2026

Nola Pool Plastering
4.4(
16
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Montegut, LA and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"Quick response to request for service. Rapid response to the site for initial evaluation and repair. I had made a bad choice and punctured two buried pipes. Repair was solid. We had some miscommunication toward the end but were able to come to an agreeable resolution."
Response time12 hrs
Recommended by81%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,689
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Montegut, LA and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Avatar for Denson's Dream Team Remodeling & Repair
Denson's Dream Team Remodeling & Repair
4.6(
5
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Montegut, LA and surrounding areas

In business since 2014

Free estimates

Emergency services offered

We at Denson's Dream Team are family owned and operated with over 20 years of experience. We pride ourselves in our quality, price and promptness. We offer free estimates! Call us today to come take a look at your project, no job is too big or too small! You can also contact Catherine at (504) 294-9258 & Keith at (985) 870-3606! We are standing by to schedule your FREE estimate today!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
Pool Mechanix
New to Angi
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Montegut, LA and surrounding areas

In business since 2024

Free estimates

Credit card accepted

We're a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guaranteeing your satisfaction!

Install Above Ground Pools FAQs, answered by experts

Customization options may include different pool shapes, sizes, decks, and additional accessories like ladders or pool lights.

Generally speaking, you should expect to wait 24 to 48 hours after filling a pool before you use it. However, the actual timeline depends on a few factors. Most importantly, you need to shock the water with chlorine or an alternative to swimming pool chlorine and let the concentration come down to a safe level before using the pool. Additionally, most water sources will be cold, and it can take days before the sun or your pool heater warms your water to a comfortable temperature. Alternatively, getting water professionally delivered could have you swimming in just a few hours.

Building a pool yourself will take at least eight to 12 weeks. After all, this is the building timeline after hiring a pool contractor who knows how to draw up plans, analyze your landscape, and apply for proper permits. If you choose to tackle any part of the process alone, assume building a pool will take two to three months at a minimum.

The most expensive part of building a pool is typically the excavation and labor, which can account for 25% to 50% of the total project cost. This is particularly true for inground pools that require significant excavation, potentially including the rental of large equipment, and extensive construction labor. In contrast, above-ground pools are generally less expensive as they typically do not require excavation and can be installed much more quickly. Concrete in-ground pools are among the most labor-intensive options.

Your aboveground pool might technically be able to stand without water, but you shouldn't consider it stable. Aboveground pools need the weight of water to provide adequate stability and prevent the walls from collapsing in. Be sure to fill your pool with water as soon as possible after installation.

The Montegut, LA homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.