Top-rated gravel driveway repair pros.

Get matched with top gravel driveway repair pros in Pippa Passes, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your gravel driveway repair project in Pippa Passes, KY?

Select your specific project to find the pro for you.

Find Gravel driveway repair pros in Pippa Passes


Big gun pressure and soft washing services Llc

No reviews yet

Big gun pressure and soft washing services Llc

No reviews yet

We only do our best. Steam cleaning , pressure washing, soft washing. Residential homes as well as commercial properties. Fully Insured and dependable. Our goal is not to just clean your home or property one time and done. We want you to want us back and to earn The business of your friends and family.

We only do our best. Steam cleaning , pressure washing, soft washing. Residential homes as well as commercial properties. Fully Insured and dependable. Our goal is not to just clean your home or property one time and done. We want you to want us back and to earn The business of your friends and family.


"David Shephard and his employees installed 2 walkways, a garbage pad and a 35’ x 18’ driveway. His price was less than other contractors bidding on the job. The work was completed satisfactorily on 08/17/2017. We noticed a crack all the way across (18’) the driveway in January 2018. I informed David. After 5 calls, 2 text messages, and 2 visits, he said that section of the driveway would be replaced. Sad to say nothing was done in 2018. He always had a reason; weather, his schedule, his personal problems. I turned the communication over to my husband in 2019. He was called 4 times. On the 4th call on 07/11/2019 David said he had been here to look at the crack again. Don’t know why he didn’t let us know when he came so we could all discuss; or why he didn’t call afterward; or why he needed to see it again. The city had been working on the streets the last time he was here and he said the city probably caused the crack. No David, this is 2019, not 2018 when the crack occurred. By this time we were very frustrated. David didn’t want to be bothered by us or our problem any longer. He stated that concrete cracks. We realize that but within 4 months? He said we were pests. Huh, go figure!! Do your job and honor the contract and you’ll never hear from us again. We asked him to at least fill the crack if he wasn’t going to replace that section. He told us we could buy patch at home improvement stores & repair it ourselves. We originally replaced the driveway due to cracks and now we’re having to live with one which is only getting worse. What good is a 3 year warranty if the contractor doesn’t honor it?? David didn’t even honor the contract for a problem that occurred within the first 5 months. You’re only as good as your word and sorry to say his word is useless."

Judith H on October 2019

Concrete work

"David Shephard and his employees installed 2 walkways, a garbage pad and a 35’ x 18’ driveway. His price was less than other contractors bidding on the job. The work was completed satisfactorily on 08/17/2017. We noticed a crack all the way across (18’) the driveway in January 2018. I informed David. After 5 calls, 2 text messages, and 2 visits, he said that section of the driveway would be replaced. Sad to say nothing was done in 2018. He always had a reason; weather, his schedule, his personal problems. I turned the communication over to my husband in 2019. He was called 4 times. On the 4th call on 07/11/2019 David said he had been here to look at the crack again. Don’t know why he didn’t let us know when he came so we could all discuss; or why he didn’t call afterward; or why he needed to see it again. The city had been working on the streets the last time he was here and he said the city probably caused the crack. No David, this is 2019, not 2018 when the crack occurred. By this time we were very frustrated. David didn’t want to be bothered by us or our problem any longer. He stated that concrete cracks. We realize that but within 4 months? He said we were pests. Huh, go figure!! Do your job and honor the contract and you’ll never hear from us again. We asked him to at least fill the crack if he wasn’t going to replace that section. He told us we could buy patch at home improvement stores & repair it ourselves. We originally replaced the driveway due to cracks and now we’re having to live with one which is only getting worse. What good is a 3 year warranty if the contractor doesn’t honor it?? David didn’t even honor the contract for a problem that occurred within the first 5 months. You’re only as good as your word and sorry to say his word is useless."

Judith H on October 2019






A and A Excavating

No reviews yet

A and A Excavating

No reviews yet
23 years of experience

We proudly offer very competitive prices on dozer work, backhoe work, clearing, site drainage (including water around homes), site prep, driveways and parking lots, ponds, water lines, light hauling (top soil, gravel, mulch), snow removal and more!

We proudly offer very competitive prices on dozer work, backhoe work, clearing, site drainage (including water around homes), site prep, driveways and parking lots, ponds, water lines, light hauling (top soil, gravel, mulch), snow removal and more!



...
Showing 1-10 of 57
Gravel Driveway Repair questions, answered by experts

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

In general, crack fillers last for about two years on average. That timeline can be shorter if you have extremely harsh winters or longer if you live in a mild climate. Luckily, this product is pretty affordable at the hardware store (about $10 to $30) and easy to DIY, so redoing it every few years shouldn’t be too much of a hassle.

On average, asphalt dries within 24 to 72 hours, meaning it’s solid enough for light traffic—walking and careful driving. Full curing—when asphalt reaches peak strength—can take anywhere from three months to a year. During that time, heavy loads and sharp objects can leave marks. Weather, asphalt mix, and thickness all affect how quickly it dries and cures. If you want your asphalt to last, treat it gently until it’s fully cured. For the best results, check with a professional asphalt contractor for their advice.

Common problems include cracks, potholes, and drainage issues. Regular maintenance prevents major damage.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

The Pippa Passes, KY homeowners’ guide to gravel driveway repair services

From average costs to expert advice, get all the answers you need to get your job done.