Top-rated asphalt driveway pros.

Best asphalt driveway pros near Pewee Valley, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Pewee Valley, KY?

Select your specific project to find the pro for you.

TRUSTED BY PEWEE VALLEY, KY HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon116
    Verified asphalt driveway services reviews

Top-Rated Asphalt driveway pros in Pewee Valley - Updated Nov 2026

The Yard Doctor, LLC
4.8(
17
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Pewee Valley, KY and surrounding areas

Approved

In business since 2018

Free estimates

Customers say: True professional

"Adam took on a very difficult job of building with rock a 19 ft high by 250 ft wide retaining wall. It was very hard and heavy work. He was up to the challenge and did a great job!"
Response time2 days
2 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for Coaty & The Crew
Coaty & The Crew
4.8(
108
)
Concrete Driveways - Install

Serving Pewee Valley, KY and surrounding areas

Approved

In business since 2025

Free estimates

Warranties offered

"I’m obsessed with the new driveway! Our old driveway was run down and just needed to be replaced. It compliments our home very well and makes it look as if it wasn’t built over 100 years ago."
Stamped Concrete
Stamped Concrete
Stamped Concrete
Stamped Concrete
Stamped Concrete

+47

21 neighbors recently requested a quote
Recommended by1%of homeowners
...
Showing 1-10 of 238
Asphalt Driveways FAQs, answered by experts

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

Yes, using recycled asphalt millings is an eco-friendly alternative compared to concrete. Millings are reclaimed pieces of gravel that are recycled into aggregate that can be used on driveways, patios, walkways, basketball courts, tennis courts, and more.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

In most cases, you don’t need a permit to repave your driveway, although some exceptions exist. If you’re widening your driveway and plan on widening the apron as well, you’ll usually need a permit from the Department of Transportation in your area. This permit costs between $50 and $300 in most cases. Most municipalities will also require a certified and insured contractor do the work relating to the apron and curb cut. You can contact your building department or ask your paving company if you need a permit. Your driveway professional will usually pull the permit for you.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Pewee Valley, KY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.