Top-rated subcontractors.

Get matched with top subcontractors in Hawesville, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Hawesville, KY?

Select your specific project to find the pro for you.

TRUSTED BY HAWESVILLE, KY HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon44
    Verified subcontracting services reviews

Find Subcontractors in Hawesville

Avatar for CONNECTIONS BY CINDY HEEP LLC
CONNECTIONS BY CINDY HEEP LLC
New to Angi
Major Home Repairs (General Contractor)

Serving Hawesville, KY and surrounding areas

Approved

In business since 2025

Free estimates

Offers commercial services

Connections by Cindy Heep is a business that connects clients to reputable businesses to get their projects completed. I currently have over 75 businesses in my network from all areas of business. I can assist in most any project that you might have or need. All of the businesses in my network are licensed and insured. I will stay involved with communication with both the client and the contractors. \nOne call and I can take care of it all !

25 neighbors recently requested a quote
Firm Foundation Creating Spaces
New to Angi
Major Home Repairs (General Contractor)

Serving Hawesville, KY and surrounding areas

Approved

Free estimates

Small jobs welcome

My wife and I with the help of a few friends designed and built our log home. We have since, remodeled a house built in 1895 back to original as much as possible. We also pastor a church in our town. We are all about the restoration process. I love taken a space and creating something new, fresh, and with purpose and life. To take a space and make it useable once again. We love working with clients that want to see transformation. The clients vision and input is so important and we will implement every possible detail they desire.

Daniel Wallace
New to Angi
Major Home Repairs (General Contractor)

Serving Hawesville, KY and surrounding areas

Approved

I’m a hardworking person who doesn’t like to leave projects half finished or looking sloppy, I can be a bit of a perfectionist. I’ve always fixed and built almost everything I needed myself and I take pride in being self sufficient. I’ve been an electrician for a year and half now and before that I was fabricating aerators for private residences. I have a wife and two children, so I can handle the chaos of a whole house remodel even if you decide to alter any details halfway through.

Avatar for Potter House Group Inc
Potter House Group Inc
4.4(
12
)
Major Home Repairs (General Contractor)

Serving Hawesville, KY and surrounding areas

In business since 2003

Emergency services offered

Credit card accepted

"

Very detail oriented, quick responses to our questions and building choices.

Uses a program called Co-Construct keeping him and us on the same page during the building. This program also tracks payment schedule. As changes, adds, or deletes occur it follows all the tweaks in written versus verbal format.


"
Additional Photos
Additional Photos
Additional Photos
Recommended by100%of homeowners
Showing 1-10 of 36
Subcontractors questions, answered by experts

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Yes, you can finance cottage construction through several options. Construction loans provide funds in stages as work progresses, while home equity loans or lines of credit are available if you have existing property. Some lenders offer a combined construction and permanent mortgage. Always review loan terms and payment milestones before committing.

Universal design is a design concept that states that products, spaces, and general environments are designed to be used by everyone, with an emphasis on accessibility for those with limited mobility or other special needs.

Blueprints are generally available for houses built after the early 1900s. Before then, detailed building schematics like blueprints were rarely used and even more rarely saved. If you have an older house and need blueprints, you can have a new set drawn up by an architect or draftsperson.

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

The Hawesville, KY homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.