Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Maize, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Maize, KS?

Select your specific project to find the pro for you.

TRUSTED BY MAIZE, KS HOMEOWNERS

  • Average homeowner rating star icon3.7
    Average homeowner rating
  • Verified reviews icon33
    Verified above ground pool installation services reviews

Find Above ground pool installation pros in Maize

Avatar for Ebeling Pools, Inc.
Ebeling Pools, Inc.
5.0(
1
)
Swimming Pool - Above Ground, Build or Install - Need Materials

Serving Maize, KS and surrounding areas

Approved

In business since 1974

Free estimates

Credit card accepted

Here at Ebeling Pools, Inc., we pride our company on reliability, great communication, integrity, and quality work. We strongly believe in giving our absolute best in all of our projects, no matter how big or small. We are experts in our trade and will always keep you educated on your particular task or project. We look forward to earning your business!

Response time3 days
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Maize, KS and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
DunAgain Pools & Decks
0.0(
1
)
Swimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Above Ground, Build or Install - Need Materials

Serving Maize, KS and surrounding areas

In business since 2010

Free estimates

DunAgain Pools & Decks has over 10 years of experience in the pool business. We have earned an A rating with the BBB and have built a reputation for quality work at a great price. When you choose DunAgain Pools & Decks you can be sure your summer will be filled with fun. Call us today for a free estimate!

Recommended by100%of homeowners
Install Above Ground Pools questions, answered by experts

Yes, you can use chlorine tablets in a salt water pool. It is not the standard recommended practice, but if your pool needs more chlorine, adding tablets can help temporarily fix the problem. Only add as many tablets as needed to keep your chlorine level around three parts per million. After adding the tablets, test your water to determine the chlorine content.

Installation typically takes 4-8 weeks, including site preparation and liner installation.

While you can install an above ground pool on most level surfaces, you’ll need sand to protect your liner from tearing. For example, rocks, plants, and twigs can take a toll on your liner. Adding sand will help level the pool even more. For additional support, you can also use angled foam or a foam pool cove.

Gunite pools are not exactly easy to maintain—but we wouldn't call them "high maintenance." It's one of the longest-lasting pool options, but its porous surface does require a lot of care. You’ll need to thoroughly clean the pool often to prevent stubborn algae growth, and the pool will require higher chemical levels to keep it clean. 

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

The Maize, KS homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.