Top-rated rototilling pros.

Get matched with top rototilling pros in Garnett, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Garnett, KS?

Select your specific project to find the pro for you.

Find Rototilling pros in Garnett


DOWNEY LAWN & LANDSCAPE

2.00(
3
)

DOWNEY LAWN & LANDSCAPE

2.00(
3
)
31 years of experience

In business over 20 years. Areas number 1 volume sod installation company. Sod, sprinkler systems, water features, fire features, patios, decks, pergolas, athletic fields, and much more!

In business over 20 years. Areas number 1 volume sod installation company. Sod, sprinkler systems, water features, fire features, patios, decks, pergolas, athletic fields, and much more!

Rototilling questions, answered by experts

Typically 1-3 days, depending on property size and terrain condition.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

If you notice small bumps on your lawn, you can flatten them by gently treading them down when the ground is wet. A lawn with larger lumps may need to be regraded by a professional to flatten it out and improve the overall drainage of the yard to prevent future lumps from forming.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Pros will assess your soil type, property geography, and rain patterns for optimal slope.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.