Top-rated paving pros.

Get matched with top paving pros in Buhler, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Buhler, KS?

Select your specific project to find the pro for you.

Find Paving pros in Buhler

Top Rank Hardscapes & Landscapes
5.0(
5
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeInterlocking Pavers for Patios, Walks & Steps - Install

Serving Buhler, KS and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Jeremiah and his crew were great to work with! They were always professional and responsive to our needs. Jeremiah and his crew were very friendly and did all that we had asked. They worked on our project until we were completely satisfied. They were very patient, dependable and always on time. So if anyone is in need of hardscaping or landscaping, I would highly recommend Top Rank! I plan on using them for future projects!"
Response time2 days
Recommended by100%of homeowners
Owsley Trucking
New to Angi
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Buhler, KS and surrounding areas

In business since 2005

Free estimates

Offers commercial services

We're a locally owned and operated company that values honesty and integrity, and stands behind our work. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building long-term relationships with our clients and guarantee your satisfaction!

Response time12 hrs
Showing 1-10 of 20
Paving Services questions, answered by experts

Depending on project size, typically 1 to 3 days, including preparation and installation.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

While water-related pressure caused by poor drainage is one common cause of paver cracking, other factors can include ground movement beneath pavers, heavy loads and wear and tear over the pavers, and climates with constant freeze-thaw cycles. In general, pavers should be resealed every three to five years to prevent cracking.

Box fill refers to the maximum number of conductors that can be contained within a wiring enclosure box, as well as the total volume of the components. Determining the allowable number of conductors in a box requires adding up the number of conductors, clamps, support fittings, devices and equipment, and equipment grounding conductors to make sure you’re within the allowable volume.

The Buhler, KS homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.